Menominee County, Wisconsin requires a building permit before covered construction begins on fee land, under Town of Menominee Ordinance No. 6312. Zoning on that land is set by the Menominee County Zoning Ordinance, which excludes tribal-owned and federal trust land34. Septic permits on fee land come from the county Zoning Department, not the building inspector5.
At a glance
- Building permit
- Required before covered construction begins on fee land12
- Zoning
- County zoning covers fee land but excludes tribal-owned and federal trust land4
- Septic permits
- Required for new, altered, replacement and reconnected POWTS on fee land56
- Owner-builder
- An owner who occupies or will occupy the home may take out construction and erosion-control permits7
- RV habitation
- Allowed only where the zoning district permits it outright or conditionally8
- Minimum home size
- Legend Lake Residential: 676 square feet of main-floor living area, on a frost-free full-perimeter foundation; other districts: ask the Zoning Department9
- Tiny homes
- No tiny-home rule by name; in Legend Lake Residential a tiny home counts as a house and needs at least 676 square feet of main-floor living area109
- Private wells
- Ordinary new private wells generally require advance Wisconsin DNR notification11
- Residential lot size
- R-1 and Legend Lake Residential lots generally require at least 20,000 square feet1213
Who to call
Building permits
Menominee County Building & Zoning Office
Building and zoning permit applications and zoning questions for land within county jurisdiction
3270 Courthouse Lane, Keshena, WI 54135-0279
Septic permits
Menominee County Zoning Department — Septic Systems (POWTS)
POWTS installation, permitting and maintenance on fee land
3270 Courthouse Lane, Keshena, WI 54135-0279
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Menominee County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Menominee County, Wisconsin?
Yes, for covered work on fee land. Town of Menominee Ordinance No. 63 requires the permit before construction begins and doubles the permit fee when work starts first2. Wisconsin's statewide Uniform Dwelling Code applies to one- and two-family dwellings built since June 1, 1980, although its listed exclusions include detached garages and accessory buildings14. The local application requires two copies of the plans2. The permit question changes if the parcel is owned by the Menominee Indian Tribe of Wisconsin or held in federal trust for the Menominee Indian Nation, because the county zoning ordinance excludes those lands4. Confirm the parcel's legal status before treating the county process as controlling.
Who issues building and zoning permits in Menominee County, and how do you reach the office?
The Menominee County Building & Zoning Office publishes five building or zoning application types and tells applicants to choose the form that fits the project, complete it and submit all applicable fees15. The office is at 3270 Courthouse Lane, Keshena, WI 54135-0279, and its main number is 715-799-571016. Town of Menominee Ordinance No. 63 authorizes the Building Inspector to issue permits to an owner or authorized agent2. The published schedule lists $850 for a single-family dwelling permit plus a $33 Wisconsin Uniform Building Permit seal, and a $75 standard zoning permit for structures17. Exterior changes generally need a county zoning permit as well as the applicable building permit, with listed exceptions for interior remodeling that does not change the footprint and individual trade permits17.
Does Menominee County have zoning?
Taxable or fee land within Menominee County jurisdiction is zoned under the Menominee County Zoning Ordinance3. The county ordinance excludes land owned by the Menominee Indian Tribe of Wisconsin and land held in federal trust for the Menominee Indian Nation4. R-1 lots generally require at least 20,000 square feet and 80 feet of width; residential structures need 10-foot side yards and 25-foot rear yards1218. Legend Lake Residential lots also generally require at least 20,000 square feet, with 10-foot side and rear setbacks, subject to shoreland rules1319. County shoreland rules generally require 75 feet between a building and the ordinary high-water mark, subject to exceptions and adjustments20. R-1 height limits are 35 feet for a principal structure and 20 feet for an accessory structure21. Legend Lake Residential allows at most 25 percent lot coverage, subject to shoreland rules, and requires at least 676 square feet of main-floor living area, four horizontal dimensions of 26 feet or more, and a frost-free full-perimeter foundation229. Agriculture and single-family housing are principal uses in A-1, but that district still has dimensional rules and some farm-related uses need conditional approval23.
How do septic permits work in Menominee County?
The Menominee County Zoning Department oversees private onsite wastewater treatment systems on fee land2425. Permits are required for new systems, alterations, replacements and reconnections; the application also requires review and approval of a soil and site evaluation6. A newly constructed building cannot be occupied until its POWTS is approved, installed and inspected26. Only 8.8% of county soils are rated without severe limitations for a conventional drain field, so establish septic feasibility before committing to a building site27. Treatment tanks must be serviced within three years after installation and at least every three years afterward, or sooner when sludge and scum reaches the ordinance's threshold25. Contact the septic program at 715-799-5710 x2 before design work begins24.
Can you live in an RV or tiny home in Menominee County?
An RV, travel trailer, bus or similar recreational shelter may be used for habitation only where the applicable zoning district allows the use outright or by conditional approval8. In the Legend Lake Residential District, seasonal camping runs from April 16 through October 14 and requires approved septic, well and electrical service28. Legend Lake guest camping is limited to two additional units, 10 consecutive days and 20 days per year; short-term camping is limited to 15 consecutive days and 30 days per year, followed by five days off site28. Legend Lake accessory structures cannot be used for human habitation29. The ordinance does not use the term tiny home. In Legend Lake Residential, single-family housing is the only permitted principal use, so a tiny home qualifies only if it meets the house standards of at least 676 square feet of main-floor living area, four horizontal dimensions of 26 feet or more and a frost-free full-perimeter foundation10. Elsewhere, no distinct countywide tiny-home rule was confirmed; ask the Zoning Department how the unit would be classified30. Manufactured homes are allowed as single-family houses in the R-1 district, which has a 20,000-square-foot minimum lot31. The R-2 district allows a single mobile home on its own lot, with an approved stand, tie-downs and maintained skirting32.
What are the steps to build a home in Menominee County?
- Confirm whether the parcel is taxable or fee land under county jurisdiction or tribal-owned or federal trust land outside the county ordinance34.
- Ask the Building & Zoning Office for the parcel's district, floodplain or shoreland overlays, dimensional limits and correct application1633.
- Complete the soil and site evaluation and obtain required POWTS approval before relying on a homesite6.
- Choose the applicable published application and submit completed forms, two plan copies and all applicable fees before work starts152.
- Call for each construction-phase inspection before covering the work34.
- Obtain the occupancy permit after health-and-safety issues are cleared; the home cannot be occupied before issuance35.
What should you check before buying land in Menominee County?
Start with title and land status because county building and zoning rules exclude tribal-owned and federal trust land4. Confirm the zoning district, shoreland limits and whether the site falls in the county Floodplain Overlay District before drawing a site plan33. A concrete or asphalt driveway or other added impervious surface within 300 feet of surface water requires a county zoning permit36. A division of a parent parcel of at least 10 acres that creates at least three new parcels falls under the county subdivision ordinance37. Test septic feasibility early because only 8.8% of county soils lack severe conventional drain-field limitations27. An ordinary new private well generally requires advance Wisconsin DNR notification, while specified high-capacity and institutional wells require prior approval11. Budget around an effective property-tax rate near 3.6% and a median annual bill near $3,5273839.
Watch-outs
- Menominee County's land-use rules do not govern land owned by the Menominee Indian Tribe of Wisconsin or held in federal trust for the Menominee Indian Nation; identify the parcel's status before applying4.
- A concrete or asphalt driveway near surface water may need a county zoning permit even when the access does not connect to a state highway36.
- Legend Lake Residential requires at least 676 square feet of main-floor living area and a frost-free full-perimeter foundation, which rules out many tiny homes there9. Other districts' minimum home size was not confirmed; ask the Zoning Department.
Sources
- Menominee County Building & Zoning Department (2026 county census)
- Menominee County Building & Zoning, quoted and re-checked
- Menominee County Building & Zoning, quoted and re-checked
- Menominee County Building & Zoning, quoted and re-checked
- Menominee County Septic Systems (POWTS), quoted and re-checked
- Menominee County Septic Systems (POWTS), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code – Who May Do the Work, quoted and re-checked
- Section 33. Modifications, Exceptions & Special Requirements, quoted and re-checked
- Menominee County Zoning Ordinance, Section 8.5 Legend Lake Residential District, quoted and re-checked
- Menominee County Zoning Ordinance, Section 8.5 Legend Lake Residential District, quoted and re-checked
- Wisconsin DNR Well and Heat Exchange Notification, quoted and re-checked
- Building & Zoning, quoted and re-checked
- Section 8.5 Legend Lake Residential (LL-R), quoted and re-checked
- One- & Two-Family (Uniform Dwelling Code), quoted and re-checked
- Menominee County Building & Zoning, quoted and re-checked
- Menominee County Building & Zoning Office (co.menominee.wi.us)
- Town of Menominee / Menominee County Permit Fee Schedule, quoted and re-checked
- Section 4. Single Family Residential District (R-1), quoted and re-checked
- Section 8.5 Legend Lake Residential (LL-R), quoted and re-checked
- Menominee County Ordinance 68, Shoreland Protection, quoted and re-checked
- Section 4. Single Family Residential District (R-1), quoted and re-checked
- Section 8.5. Legend Lake Residential (LL-R), quoted and re-checked
- Section 15. Exclusive Agriculture District (A-1), quoted and re-checked
- Menominee County Zoning Department — Septic Systems (POWTS) (co.menominee.wi.us)
- Septic Systems (POWTS), quoted and re-checked
- Menominee County Ordinance #40, Private On-site Wastewater Treatment Systems, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Section 8.5 Legend Lake Residential (LL-R), 2025 amended, quoted and re-checked
- Section 8.5 Legend Lake Residential (LL-R), 2025 amended, quoted and re-checked
- Menominee County Building & Zoning (2026 county census)
- Section 4 Single Family Residential District (R-1), quoted and re-checked
- Section 5 Single-Family Mobile Home District (R-2), quoted and re-checked
- Menominee County Building & Zoning, quoted and re-checked
- Wisconsin’s Uniform Dwelling Code, quoted and re-checked
- Town of Menominee Ordinance No. 63 – Occupancy Permit Provision, quoted and re-checked
- Menominee County Building & Zoning, quoted and re-checked
- co.menominee.wi.us, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.