Bolthole Index

Oconto County, Wisconsin

Building permits, zoning and land rules in Oconto County, Wisconsin

76Index Score / 100
#10 of 72 in Wisconsin

Oconto County, Wisconsin requires a building permit and inspections for a new one- or two-family home under the statewide Uniform Dwelling Code; a delegated municipality or Wisconsin DSPS handles them12. Oconto County separately handles zoning and sanitary permits34. Permanent RV living is prohibited, and every dwelling must have at least 700 square feet of livable area56.

At a glance

Building permit
Required for a new one- or two-family home; contact the municipality for filing and inspection12
Zoning
County zoning applies through the ordinance and adopted township zoning maps; dimensional rules vary by district37
Septic permit
Oconto County processes required sanitary permits; some systems also require state action89
RV living
No permanent habitation; stays beyond 60 consecutive days need a temporary-use permit and approved sanitary facility510
Tiny home
Dwellings must be at least 700 square feet; park-model RVs belong only in licensed campgrounds611
Owner-builder
An owner who occupies or will occupy the home may obtain the construction and erosion-control permits12
Private well
Give Wisconsin DNR advance notice before constructing a new non-high-capacity well unless an exception applies13
Lot size and setbacks
Both are specified, but the parcel's district, sewer status, road class and shoreland location change the answer1415

Who to call

Zoning

Oconto County Planning, Zoning and Solid Waste Department

County general zoning, floodplain, shoreland protection, sanitary, land division and physical-address permits and inspections

920-834-6827

301 Washington Street, Oconto, WI 54153

Septic permits

Oconto County Zoning Office — Sanitary Department

Sanitary permits and regulation of private onsite wastewater treatment systems in Oconto County

920-834-6827

301 Washington Street, Oconto, WI 54153

Roads & driveways

Oconto County Highway Department

County driveway permits and work in county highway right-of-way

920-834-6886

202 Van Dyke Street, Oconto, WI 54153

Contact details are copied from each office’s official page and were checked against it on October 7, 2026.

Off-grid gear

Going off-grid in Oconto County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Oconto County, Wisconsin?

Yes. Oconto County requires a building permit for a new one- or two-family dwelling, including a stick-built, modular or manufactured home1. Wisconsin's statewide Uniform Dwelling Code governs these homes, with a delegated municipality issuing the permit when applicable and Wisconsin DSPS doing so where a municipality lacks that authority1617.

The UDC building permit is only one approval. Oconto County separately processes land-use, sanitary and, when applicable, floodplain permits1819. Required UDC inspections include footings, foundation and reinforcement, rough work, insulation and a final inspection; the permit identifies the inspector to notify2. An owner who occupies or intends to occupy the home may apply without Dwelling Contractor Certification, but the owner-builder allowance does not waive the building permit or code12.

Who issues Oconto County building permits, and how do you reach the offices?

A delegated municipality or Wisconsin DSPS issues the UDC building permit and arranges inspections for a new home in Oconto County12. Oconto County Planning, Zoning and Solid Waste is the county counter for general zoning, floodplain, shoreland protection, sanitary review, land division and physical addresses20. Call 920-834-6827 or visit 301 Washington Street, Oconto, WI 5415320.

For access from a county highway, the Oconto County Highway Department publishes a driveway permit, with a $200 non-refundable fee for a new driveway access request and higher after-the-fact fees21. Call 920-834-6886 or visit 202 Van Dyke Street in Oconto22. A connection to a state trunk highway instead requires a WisDOT permit23.

Does Oconto County have zoning?

Yes. The Oconto County Zoning Ordinance includes adopted township zoning maps, while annexed shoreland areas may be administered by the annexing city or village3. Permitted uses and dimensions depend on the mapped district7. The Agricultural District has a 10-contiguous-acre minimum parcel size for permitted uses, while other districts have their own standards2414.

Setbacks vary by zoning district and may be supplemented by shoreland rules15. The basic height limit for regulated objects, structures and equipment is 35 feet, but agricultural, communications and power-generating structures have separate standards; architectural projections and approved waivers are also treated differently25. Creating parcels is regulated too: county staff review land divisions, including parcels smaller than 10 acres, and approved maps must be recorded26.

How do septic permits work in Oconto County?

Oconto County Zoning administers the county sanitary ordinance, while Wisconsin statutes and administrative codes also apply; some systems require state action before the county can issue its permit8. A county sanitary permit may require a soil and site evaluation and recorded maintenance agreements, although replacing listed components such as a manhole cover, baffle or pump does not require one9. With few exceptions, POWTS work must be done by a properly licensed plumber and permitted by Oconto County27.

Plan the soil evaluation early: only about 13.4% of Oconto County soils are rated without severe limits for a conventional septic drain field28. A private sewage system serving a newly constructed building, or a building requiring a reconnection permit, must be approved, installed and inspected before occupancy29. Where a land division can connect to sanitary sewage collection and treatment, laterals and services must be installed to the property line during development and connection is required before occupancy30.

Can you live in an RV or tiny home on your land in Oconto County?

Oconto County prohibits permanent habitation in an RV or camping unit on a private parcel5. Recreational use may last up to 60 consecutive days; annual placement requires a land-use permit and an approved sanitary facility, is excluded in Floodplain and Conservancy Districts, and cannot involve renting the RV outside a licensed campground510. A campground itself needs Park and Recreation zoning and conditional-use approval31.

Every dwelling used for human habitation must contain at least 700 square feet of livable area6. The county says tiny homes and park-model RVs typically do not qualify as RVs and are not allowed outside places such as campgrounds zoned for them; park-model RVs are limited to licensed campgrounds115. In a mobile-home park, a stand may cover at most one-third of its lot, and the stand, parking and accessory structures together may cover at most one-half32.

Building a home in Oconto County: the steps, in order

  1. Identify the mapped zoning district and confirm the use, lot size, setbacks and height limits with Oconto County Planning, Zoning and Solid Waste71525.
  2. Ask county staff whether the project needs wetland review, rezoning, conditional-use approval, a variance, land-division review, driveway access or a floodplain permit; the county's published process is a partial guide, not an exhaustive list3318.
  3. Complete any required soil and site evaluation and obtain the Oconto County sanitary permit9.
  4. Obtain the applicable county land-use and floodplain approvals1920.
  5. Apply to the delegated municipality or Wisconsin DSPS for the UDC building permit1. An owner-occupant may use the owner-builder route but still needs the permit12.
  6. Notify the inspector for each required construction inspection2.

What should you check before buying land in Oconto County?

Verify the mapped district, parcel size, road and shoreland setbacks, floodplain status, legal access and whether a proposed split needs county review with Oconto County Planning, Zoning and Solid Waste141534. If a private well is planned, Wisconsin generally requires advance notice to DNR before a new non-high-capacity well is built13. A habitable structure with neither plumbing nor water service may use a privy, composting toilet or another alternative as its POWTS, but it needs a county sanitary permit and inspection before installation35.

Test septic feasibility early because only about 13.4% of county soils avoid severe limits for a conventional drain field28. Oconto County is about 61% wooded and about 92% of its land has a slope of 15% or less, useful context for clearing and site-layout estimates but not a substitute for a parcel survey3637. The effective property-tax rate is about 1.3%, and the median annual property-tax bill is about $2,6513839.

Watch-outs

  • Do not assume a county zoning district answers the whole site plan: minimum lot size varies by district and sewer status, while setbacks vary with road class and shoreland location1415.
  • An RV is not a permanent dwelling, and annual placement requires a land-use permit plus an approved sanitary facility; Floodplain and Conservancy Districts are excluded10.
  • Only about 13.4% of county soils avoid severe limits for a conventional septic drain field, so a favorable-looking parcel can still need a more involved wastewater design28.
  • Oconto County's certificate-of-occupancy details, county-specific private-well permit requirement and accessory-dwelling rules could not be confirmed; ask the UDC building inspector and county zoning office before committing to those plans20.

Sources

  1. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  2. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  3. Zoning, quoted and re-checked
  4. Sanitary, quoted and re-checked
  5. ocontocountywi.gov, quoted and re-checked
  6. Chapter 14 Zoning Ordinance, quoted and re-checked
  7. Zoning Maps, quoted and re-checked
  8. Chapter 12 Sanitary Ordinance, quoted and re-checked
  9. Chapter 12 Sanitary Ordinance, quoted and re-checked
  10. ocontocountywi.gov, quoted and re-checked
  11. RV and Camper Use Guide, quoted and re-checked
  12. Instructions for Submitting a UDC Permit Application, quoted and re-checked
  13. Well and heat exchange notification (Wisconsin statewide rule), quoted and re-checked
  14. Chapter 14 Zoning Ordinance, quoted and re-checked
  15. Chapter 14 Zoning Ordinance, quoted and re-checked
  16. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  17. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  18. Zoning, quoted and re-checked
  19. Steps to Acquiring Permits in Oconto County, quoted and re-checked
  20. Oconto County Planning, Zoning and Solid Waste Department (ocontocountywi.gov)
  21. Oconto County Driveway Permit, quoted and re-checked
  22. Oconto County Highway Department (ocontocountywi.gov)
  23. Frequently asked questions – State highway connection permits (Wisconsin statewide rule), quoted and re-checked
  24. Chapter 14 Zoning Ordinance, quoted and re-checked
  25. Chapter 14 Zoning Ordinance, quoted and re-checked
  26. Land Divisions, quoted and re-checked
  27. Oconto County Zoning Office — Sanitary Department (ocontocountywi.gov)
  28. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  29. Chapter 12 Sanitary Ordinance, quoted and re-checked
  30. Chapter 13 Oconto County Land Division Ordinance, quoted and re-checked
  31. Oconto County RV/Camper Use Guide, quoted and re-checked
  32. Chapter 14 Zoning Ordinance, quoted and re-checked
  33. Steps to Acquiring Permits in Oconto County, quoted and re-checked
  34. Zoning, quoted and re-checked
  35. Sanitary, quoted and re-checked
  36. Wooded share of land: Bolthole Index county data
  37. Share of land at 15% slope or less: Bolthole Index county data
  38. Effective property tax rate: Bolthole Index county data
  39. Median property tax bill: Bolthole Index county data

Written October 7, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Oconto County requires a building permit for a home.

RuleOconto CountyMenominee CountyMarinette CountyShawano CountyLanglade CountyOutagamie CountyBrown County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesNo
Septic permitsCounty PlanningCounty Land Conservation/Forestry/ZoningCounty Land InformationCounty Planning & DevelopmentCounty Land Records & Regulations Dept.County Development & Land ServicesCounty Planning & Land Services

County locator

Oconto County in Wisconsin

76
County map
Oconto County highlighted among the Wisconsin counties · colored by Index score

How Oconto County scores

Seclusion67100% ev.
Self-Sufficiency70100% ev.
Admin Boringness44100% ev.
Durability67100% ev.
Property Autonomy70100% ev.
Carry Cost65100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$315kTypical home
1.3%Property tax
$5,367Land / acre
32.4"Annual rain
0.8% of yrsSevere drought
1.2 / yr (+1.2)Mid-century 100°F days
12.9 daysMid-century dry spell
1.54" (+11.4%)Mid-century 1-day rain
1.6×Wildfire change factor
100%Forward climate coverage
$1,031Home insurance / yr
1.6% / yrInsurance growth
0.46%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
9,123People within 30 min
1,128,098People within 2 hr
23,674Radius comparison (15 mi)
39.9People / sq mi
22.1%Federal land
92%Land at 15% slope or less
13.4%Soils rated "not limited" for septic (strict USDA rating)
83,475 acWorkable land screen
61%Wooded land
45.1 tonsBiomass / forest ac
43.5°FAvg temp

Scout Oconto County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Oconto County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Oconto County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Town of Abrams · Town of Bagley · Town of Brazeau · Town of Breed · Town of Chase · Town of Doty · Gillett · Town of Gillett · Town of How · Town of Lakewood · Town of Lena · Village of Lena · Town of Little River · Town of Little Suamico · Town of Maple Valley · Town of Morgan · Town of Mountain · Oconto · Town of Oconto · Oconto Falls · Town of Oconto Falls · Town of Pensaukee · Town of Riverview · Town of Spruce · Town of Stiles · Village of Suring · Town of Townsend · Town of Underhill

Answers from the rulebook for Oconto County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Oconto County rules

  • County-wide zoningPresent

    Oconto County Zoning Ordinance and associated township zoning maps administered by Oconto County Zoning.

    • Shoreland zoning provisions for areas annexed after May 7, 1982 remain in effect but are administered by the annexing city or village.
    • The ordinance includes township zoning maps adopted as part of the ordinance.
    “This ordinance shall be known and cited as the Oconto County Zoning Ordinance. This ordinance shall include each township zoning map hereby adopted and made a part herein.”
  • Zoning districtsPublished (with conditions)

    Oconto County zoning districts and mapped zoning areas.

    • The county publishes zoning maps by town or municipality.
    • District-specific dimensional rules apply.
    “14.700 Residential Single-Family District (R-1) 14.800 Residential Multi-Family District (R-2) 14.900 Mobile Home Park District (R-3) 14.1000 Community Service District (CS) 14.1100 Park and Recreation District (DR) 14.1200 Forest District (F) 14.1300 Rural Residential (RR) 14.1400 Agricultural District (A)”
  • Minimum dwelling sizeSpecified

    Any dwelling used for human habitation under Oconto County zoning.

    • The dwelling must contain at least 700 square feet of livable area.
    • Other dimensional and construction requirements also apply.
    • Applicable Wisconsin regulations preempt conflicting county provisions.

    minimum livable area: >= 700 sq ft

    “Any dwelling used for human habitation must contain a minimum of 700 square feet of livable area.”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots and principal uses governed by Oconto County zoning districts.

    • Specific lot-size and dimensional standards are identified by zoning district.
    • Uses without specified district standards are governed by §14.420 operational and site-plan standards.
    “Generally, the text for each zoning district identifies specific lot size and dimensional standards for principal uses in the district. However, in many districts there are uses, permitted and conditional, that have no specified lot size dimensional standards within the text for that district.”
    One more reviewed finding on this topic
    • Specified — Permitted uses in Oconto County Agricultural District A.
      “Permitted Uses: The minimum parcel size in this district is 10 contiguous acres. (amended 5-15-97, 12-17-98)”
  • SetbacksSpecified

    Buildings, structures, and land uses regulated by the county zoning ordinance.

    • Required setback areas and yard spaces must be located on the same legal parcel as the principal structure or use.
    • Specific standards vary by zoning district and may be supplemented by shoreland rules.
    “All required setback areas and yard spaces shall be located on the same lot (that is, the legal parcel of record) as the principal structure or use.”
  • Lot coverageSpecified

    Mobile-home parks and mobile-home stands under Oconto County zoning.

    • A mobile-home stand may not exceed one-third of its lot area.
    • The stand area, on-lot parking and accessory structures together may not exceed one-half of the lot area.

    mobile-home stand maximum lot area: <= 33.333333 percent · stand plus parking and accessory structures maximum lot area: <= 50 percent

    “Mobile home stands shall not occupy an area in excess of 1/3 of their respective lot area. The sum of the stand area and the area occupied by on lot parking and accessory structures shall not exceed 1/2 of the lot area.”
    One more reviewed finding on this topic
    • Specified — Mobile-home stands and related structures in applicable Oconto County zoning districts.
      “Mobile home stands shall not occupy an area in excess of 1/3 of their respective lot area. The sum of the stand area and the area occupied by on lot parking and accessory structures shall not exceed 1/2 of the lot area.”
  • Building heightSpecified

    Regulated objects, structures and equipment in Oconto County zoning districts.

    • The basic limit may be waived by the Planning and Zoning Committee upon application.
    • Agricultural, communication and power-generating structures have separate height standards.
    • Architectural projections are exempt.
    • Airport height limitations apply in affected areas.

    basic height limit: 35 ft (May be waived or superseded by stated exceptions and airport limitations.)

    “A basic height limit of 35 feet is hereby established for all regulated objects, structures and equipment in all zoning districts.”
    One more reviewed finding on this topic
    • Specified — Regulated objects, structures, and equipment in Oconto County zoning districts.
      “A basic height limit of 35 feet is hereby established for all regulated objects, structures and equipment in all zoning districts.”
  • Living in an RVLimited

    Recreational vehicles and camping units on private parcels.

    • Permanent habitation is prohibited.
    • Recreational use is limited to 60 consecutive days unless an annual land-use permit and approved sanitary facility are obtained.
    • Annual placement is excluded in Floodplain and Conservancy Districts.
    • Park-model recreational vehicles are allowed only in licensed campgrounds.
    • Leasing or renting RVs outside licensed campgrounds is not allowed.

    maximum consecutive recreational-use duration: 60 days (May exceed 60 consecutive days with annual land-use permit and approved sanitary facility.)

    “they shall not be used for the purpose of permanent habitation”
    One more reviewed finding on this topic
    • Limited — Recreational vehicles, travel trailers, truck campers, and motor homes on private property in county-regulated areas.
      “Camping trailers, truck campers, houseboats and motor homes may be permitted for their recreation uses in all districts excluding the Floodplain District except that they shall not be used for the purpose of permanent habitation. Such recreation vehicles shall not remain on any lot or premises more than 60 consecutive days. Any such vehicle may be left on the land for more than 60 days provided that a temporary use permit is obtained and an approved sanitary facility is provided.”
  • Camping on your landLimited

    Temporary camping and annual RV/camping-unit placement on private parcels.

    • Annual placement requires an annual land-use permit and sanitary permit for an approved sanitary facility.
    • The land-use permit is valid until December 31 of the issuance year.
    • Floodplain and Conservancy District exclusions apply.

    land-use permit validity: December 31 of issuance year

    “Annual placement of a recreational vehicle/camping unit is allowed with issuance of an annual land use permit and sanitary permit for an approved sanitary facility.”
    One more reviewed finding on this topic
    • Limited — Temporary camping and campground uses in county-regulated areas.
      “Campground standards: Any property with 4 or more camp sites or 1 to 3 camp sites, if advertised as a campground, require proper zoning permits for use as a campground. Consult with Zoning staff if you intend to run a campground. Campgrounds are only permitted on property zoned Park & Recreation with a conditional use permit.”
  • Tiny homesLimited

    Tiny homes in county-regulated areas.

    • A home less than 700 square feet is not allowed.
    • Permanent homes greater than 700 square feet require proper land-use permits, building inspections, sanitary permits, and POWTS.
    • Tiny homes may be accepted at a properly zoned private campground.

    minimum floor area for permanent home: > 700 square feet (Homes less than 700 square feet are not allowed.)

    “Any home less than 700 square feet is not allowed”
    One more reviewed finding on this topic
    • Limited — Tiny homes and park-model RVs on Oconto County properties.
      “Tiny homes and Park Model RV’s typically don’t meet the definition of RV’s and are not allowed on properties outside of areas such as campgrounds specifically zoned for their use!”
  • Manufactured homesLimited

    Permanent manufactured-home residence occupancy under Oconto County zoning districts.

    • Manufactured homes are permitted in the R-1, R-2, CS, PR, and F districts as identified in the ordinance excerpts.
    • R-3 permits manufactured homes only when located within a mobile home park.
    • Permanent dwelling standards include a minimum 700 square feet, minimum nominal width of 14 feet, nominal roof pitch of 3 inches per 12 inches, and construction no more than 15 years before application; nonconforming dwellings may require conditional use approval.
    • Footings and foundations meeting SPS 321 are required for manufactured homes and mobile homes.

    minimum living area: >= 700 square feet (A dwelling failing specified criteria may be allowed conditionally if nominal width is at least 14 feet.) · minimum nominal width: >= 14 feet (Conditional-use exception still requires at least 14 feet.) · nominal roof pitch: 3/12 (A dwelling not meeting criteria may be conditional if nominal width is at least 14 feet.) · maximum age at application: <= 15 years (Older existing dwellings may be allowed only with conditional use approval.)

    “A dwelling that does not meet the criteria in 14.427 1. 2. and 3. may be used for human habitation as a conditional use if the dwelling has a nominal width of at least 14 feet.”
  • Who permits septicMixed (with conditions)

    Private onsite wastewater treatment systems and non-plumbing sanitation systems in Oconto County.

    • Oconto County Zoning administers the county sanitary ordinance.
    • State statutes and Wisconsin Administrative Code also apply.
    • Some systems require state action before county permit issuance.
    “Sanitary Permit: A county and/or state sanitary permit issued by the Department for the installation of a private onsite waste treatment system or holding tank.”
    2 more reviewed findings on this topic
    • County (with conditions) — Private onsite wastewater treatment systems in Oconto County.
      “We provide information and assist with applications for county permits for land use, minor structures, assist in assigning Emergency 911 property addresses, process sanitary permits, issue sign permits, process applications for public hearing actions such as zone changes, conditional use permits and variances, conduct certified survey and plat reviews and assist state and federal agencies with their permitting when needed.”
    • County (with conditions) — Private onsite wastewater treatment systems and sanitary permits in Oconto County.
      “The Sanitary Department of the Oconto County Zoning office enforces the Oconto County Sanitary Ordinance.”
  • Septic permitRequired

    Private sewage systems, reconnections, modifications, replacements, and non-plumbing sanitary systems in Oconto County.

    • A permit is not required for addition of manhole risers or replacement of manhole covers, manhole risers, baffles, or pumps.
    • A permit application may require soil and site evaluation and recorded maintenance agreements.
    “Every private sewage system shall require a separate application and sanitary permit.”
    One more reviewed finding on this topic
  • Septic inspectionRequired

    Private sewage systems serving newly constructed buildings or structures requiring a reconnection permit.

    • The system must be approved, installed and inspected before the building may be occupied.
    • The ordinance does not warrant system function or guarantee defect-free compliance.
    “The private sewage system for newly constructed buildings or structures requiring a Reconnection Permit shall be approved, installed, and inspected before the building may be occupied.”
  • Off-grid sanitationAllowed (with conditions)

    A habitable structure without plumbing and without water service.

    • Privies, composting toilets, and other alternatives may be used as POWTS.
    • A county sanitary permit is required before constructing or installing a non-plumbing sanitary system.
    • Non-plumbing systems must be inspected.
    “If a habitable structure does not contain plumbing and has no water service, then privies, otherwise known as out-houses, or other alternatives to privies (i.e., composting toilets, etc.) may be used as a POWTS.”
  • Mandatory utility hookupConditional

    Land divisions that can connect to sanitary sewage collection and treatment facilities.

    • Laterals and services to the property line must be installed during development.
    • Connection to the available treatment system is required before occupancy.
    “connected to the available treatment system prior to occupancy”
  • Subdividing landRegulated (with conditions)

    Creation of parcels and land divisions in Oconto County, including parcels smaller than ten acres.

    • Land divisions must conform to the county ordinance, Wisconsin Statutes Chapter 236 and applicable comprehensive plans.
    • County Planning and Zoning staff act within 40 days to approve or reject submitted land divisions.
    • An approved map must be recorded with the Register of Deeds within 30 days.

    county review period: 40 days · recording period after approval: 30 days

    “Oconto County regulates land divisions (the creation of a parcel smaller than ten acres) to protect and provide for the public health, safety, and general welfare of the municipalities.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Land division and subdivision activity in Oconto County.
      “Oconto County Zoning is responsible for the administration and enforcement of the following ordinances and programs: Zoning Ordinance, Subdivision Ordinance, Private Onsite Wastewater Treatment System Ordinance, Wisconsin Fund Grant Program, Floodplain Ordinance, Animal Waste Management Ordinance, Shoreland/Wetland Zoning Ordinance, and Non-Metallic Mining Reclamation Ordinance.”
  • Building in a floodplainRequired

    Development requiring floodplain review in Oconto County.

    • A floodplain permit is required when applicable to the proposal.
    • The county guide separately identifies state or federal permits that may also be required.
    “Step 12: (FLOODPLAIN PERMIT) Apply for any required Oconto County Floodplain Permit(s).”
  • Permit feesPublished (with conditions)

    Oconto County Highway Department driveway access permits on county highways and specified existing-driveway transactions.

    • New driveway access request: $200 non-refundable.
    • Newly created local road access requiring a plat: $250.
    • Permit applied for after installation: $800.
    • Blacktopping an existing driveway: $100.
    • Permit after blacktopping: $250.
    • Removal of illegally placed driveway: actual cost.
    • Existing driveway culvert replacement/extension or physical address: no fee.

    new driveway access request fee: 200 USD (Non-refundable.) · newly created local road access fee: 250 USD (Plat required.) · existing driveway fee: 0 USD (Culvert replace/extend or physical address.)

    “1. New Driveway Access Request: $200 (Non-Refundable) 2. Newly Created Local Road Access, Plat Required: $250”
  • Permit processPartial

    Oconto County zoning, land-use and sanitary permitting.

    • The county assists with land-use applications, processes sanitary permits, issues sign permits and handles public-hearing applications.
    • UDC applications and inspections may instead be handled by a delegated municipality or DSPS.
    “assist with applications for county permits”
    One more reviewed finding on this topic
    • Published (with conditions) — County land-use and development permitting process.
      “PREPARED BY OCONTO COUNTY PLANNING AND ZONING TO SERVE AS A GENERAL STEP GUIDE AND IS NOT INTENDED TO INCLUDE ALL POTENTIAL STEPS THAT MAY BE REQUIRED TO PERMIT CERTAIN PROPOSALS. UPDATED 12/2024”

Wisconsin rules that apply here

  • Building permitRequired

    New one- and two-family dwellings covered by Wisconsin’s Uniform Dwelling Code, including covered additions and alterations.

    • The cited brochure states that permit requirements for alterations and additions vary by municipality.
    • Construction begins only after plans are approved and the building permit is issued and posted.
    • The enforcing jurisdiction may be the municipality, county, or state.
    • Local zoning, land-use, floodplain, sanitary, well, driveway, utility, and other approvals may also be required.
    • A building permit cannot be issued for a new dwelling using a private onsite wastewater treatment system until a sanitary permit has been issued.
    “Begin construction after plans are approved and building permit is issued and posted.”
    2 more reviewed findings on this topic
    • Required — New one- and two-family dwelling construction in Oconto County.
      “Building a UDC Home [...] Submit complete plans including plot, erosion control, foundation, floor layout(s), building cross-section(s) and exterior building wall views (elevations); documentation of thermal envelope compliance including the building’s heat loss summation (BTUs/hour); Permit Application; fees and”
    • Required — New one- and two-family dwelling units in Oconto County.
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
  • Owner-builder exemptionConditional

    An owner obtaining construction and erosion-control permits for a dwelling covered by the Wisconsin Uniform Dwelling Code.

    • The owner must occupy the home currently or will occupy it after completion.
    • The exemption permits the owner to take out the construction and erosion-control permits without the state-certified Dwelling Contractor and Dwelling Contractor Qualifier arrangement described for contractors.
    • The owner-occupancy statement must be checked on the permit application if the applicant does not possess Dwelling Contractor certification.
    • The source describes an owner-occupancy condition; it does not establish a general exemption for non-occupant owners.
    “The construction and erosion control permits must be taken out by a state-certified Dwelling Contractor, who also employs a state-certified Dwelling Contractor Qualifier, or by the owner who occupies the home currently or will after completion.”
    2 more reviewed findings on this topic
    • Conditional — Owner-occupants applying for Wisconsin UDC erosion-control or construction permits for a dwelling in Oconto County.
      “I vouch that I am or will be an owner-occupant of this dwelling for which I am applying for an erosion control or construction permit without a Dwelling Contractor Certification and have read the cautionary statement regarding contractor responsibility on the reverse side of the last ply of this form.”
    • Available (with conditions) — Owner-occupants applying for Wisconsin UDC erosion-control or construction permits.
      “Only check this box if the permit is being issued to the property owner”
  • Building code adoptedAdopted (with conditions)

    Public buildings, places of employment, and multifamily buildings subject to Wisconsin's commercial building code.

    • The Division of Industry Services reviews plans before construction for compliance with state statutes and building codes.
    • Local certified municipalities may provide plan review and inspection services for certain building types.
    • The Wisconsin Commercial Building Code adopted the 2021 ICC effective September 1, 2025; plans submitted November 1, 2025 or later must comply with the updated code.
    • Municipalities may have grandfathered fire detection, prevention, and suppression ordinances under 2013 Act 270.

    2021 ICC adoption date: September 1, 2025 (The deadline for building plan compliance was delayed.) · updated-code plan-submission deadline: November 1, 2025 (Plans submitted on or after this date must comply with the updated Commercial Building Code.)

    “2013 Act 270 establishes a uniform commercial building code in Wisconsin while allowing municipalities to grandfather fire detection, prevention, and suppression ordinances”
    6 more reviewed findings on this topic
    • Adopted (with conditions) — One- and two-family dwellings in Oconto County.
      “The statewide code for new homes in Wisconsin is the Uniform Dwelling Code (UDC), SPS 320-325 of the Wisconsin Administrative Code and its adopted references. It is a uniform building code that applies across the state.”
    • Adopted (with conditions) — New one- and two-family dwellings, including manufactured homes, statewide.
      “The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code.”
    • Adopted — New one- and two-family dwellings, including manufactured homes, in Oconto County.
      “The program governing one- and two-family dwelling units”
    • Adopted (with conditions) — New one- and two-family dwellings in Wisconsin built since June 1, 1980.
      “The Uniform Dwelling Code (UDC) is the statewide building code for one- and two-family dwellings built since June 1, 1980.”
    • Adopted (with conditions) — New Wisconsin one- and two-family dwelling construction, including stick-built, modular, and manufactured home installations
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
    • Adopted — Wisconsin's Uniform Dwelling Code, chapters SPS 320-325, for new one- and two-family dwelling units, including stick-built, modular, and manufactured home installations.
      “SPS 320-325 Uniform Dwelling Code (UDC), construction standard for 1-2 family dwelling units, applies uniformly statewide”
  • InspectionsRequired

    Each phase of construction of a one- or two-family dwelling governed by the Wisconsin Uniform Dwelling Code.

    • Inspections are called for before each phase is covered up.
    • The local inspector’s instructions apply.
    • The inspector has two business days after the inspection request and the work being ready to inspect before the work may be covered.
    • Inspections check compliance with the code and may also check compliance with approved plans.
    • The UDC is enforced by municipal or county building inspection departments or the Wisconsin Division of Industry Services.

    inspection response period: 2 business days (After the inspection request and the work is ready to inspect, before the work may be covered up.)

    “Call for inspections of each phase of construction prior to covering it up - check the local inspector’s instructions. The inspector has two business days after the date that you make the inspection request and the work is ready to inspect, before you may cover up the work. Inspectors will check for compliance with the code.”
    One more reviewed finding on this topic
  • Certificate of occupancyLimited

    Occupancy of a dwelling governed by Wisconsin’s Uniform Dwelling Code after construction.

    • Occupancy follows a final inspection in which no major health or safety violations are found.
    • Some municipalities will issue occupancy permits; the state source does not state that every municipality must issue a certificate or occupancy permit.
    • The dwelling exterior must be completed within two years after permit issuance.

    exterior completion deadline: 2 years after permit issuance

    “Take occupancy after receiving a final inspection in which no major health or safety violations are found. (Some municipalities will issue occupancy permits.) Also, the dwelling’s exterior must be completed within two years after permit issuance.”
  • Well permitLimited

    Construction of private wells statewide in Wisconsin.

    • A Well Construction Notification Number must be obtained before constructing a new private well that is not a high-capacity well.
    • Exceptions to the notification requirement include high-capacity wells, reconstruction of existing wells, and wells on Native American property; high-capacity wells or other wells requiring written DNR approval follow the approval requirements.
    • Some DNR-approved county ordinances additionally require a well permit before construction.
    • A Well Construction Report must be submitted to DNR within 30 days after construction.

    well construction notification fee: 50.5 USD (Fee and notification number are not refundable or transferable.) · well construction report deadline: 30 days after construction

    “Wisconsin law requires that a property owner provide advance notice to DNR before construction of any new private well that is not a high capacity well, and advance notice of any heat exchange drillhole construction (geothermal system) that does not require a written DNR approval.”
  • Agricultural exemptionConditional

    Wisconsin farmland preservation zoning districts and farmland preservation agreements; these are conditional agricultural-use protections and tax-credit frameworks, not a blanket exemption from local land-use or land-division ordinances.

    • Certified farmland preservation zoning districts limit land uses to agriculture and other compatible uses.
    • Local ordinances are crafted locally and must meet or be more restrictive than Chapter 91 standards.
    • A farmland preservation agreement requires land to remain in agricultural use for 10 years and comply with state soil and water conservation standards.
    • Agreement eligibility requires ownership of the farmland, location in a designated Agricultural Enterprise Area, at least $6,000 gross farm revenue during the last year or $18,000 during the last three years, and compliance with applicable conservation standards.
    • A certificate of compliance from the county land conservation committee is required to show compliance.
    • Other local zoning and land-division ordinances continue to apply.
    • A covered agreement provides exemption from special assessments for sanitary sewer or water imposed by specified local governmental entities.
    • Releases before expiration require written consent, a DATCP finding that agricultural use of other protected farmland will not be impaired, and payment of the specified conversion fee.

    farmland preservation agreement term: 10 years (agreements effective before December 8, 2023, were minimum 15-year agreements) · minimum gross farm revenue during last year: >= 6000 USD (alternative test of $18,000 during the last three years) · minimum gross farm revenue during last three years: >= 18000 USD (alternative to the $6,000 last-year test) · tax credit: $10.00 per acre or $12.50 per acre if also in a certified farmland preservation zoning district (other eligibility requirements apply)

    “Remember that other local ordinances (such as zoning and land division ordinances) continue to apply to your land, regardless of whether you sign an agreement.”
  • Driveway accessRequired

    A new or altered driveway or other connection to a state trunk highway and work in state highway right-of-way.

    • WisDOT issues permits on state highways under its jurisdiction; county highways and municipal roads may be subject to county or municipal permitting instead.
    • The number of driveways serving a single state-trunk-highway frontage must be the minimum deemed necessary for reasonable service without undue impairment of safety, convenience, and utility.
    • A controlled-access designation or other access restriction may require a different application or prevent the connection.
    • A residential connection may be limited to 24 feet wide and a commercial connection to 35 feet wide at the right-of-way line.

    residential connection maximum width: 24 feet at right-of-way line · commercial connection maximum width: 35 feet at right-of-way line

    “So, a permit is required from WisDOT before you construct a new connection to your property. [...] Why can my connection only be 24 feet wide (residential) or 35 feet wide (commercial)? [...] These distances are measured at the right-of-way line.”
    2 more reviewed findings on this topic
    • Required — Driveways and other connections between property abutting Wisconsin state highway right-of-way and the state highway.
      “For state highways, WisDOT requires a connection permit.”
    • Limited — Multiple driveway connections serving one property frontage along a Wisconsin state trunk highway.
      “The number of driveways permitted serving a single property frontage along a state trunk highway shall be the minimum deemed necessary by the department for reasonable service to the property without undue impairment of safety, convenience, and utility of the highway.”
  • Short-term rentalsLimited

    Lodging rented to tourists or transients for short periods in Wisconsin, including homes, condos, cabins, cottages, and similar lodging facilities.

    • A DATCP lodging permit is required for all lodging facilities in Wisconsin.
    • A tourist or transient must be away from the person's permanent address.
    • The reviewed source does not establish local zoning or municipal operating restrictions.
    “If lodging is rented to a tourist or transient, it will require a permit.”
  • Campground & park staysLimited

    Recreational trailers, pickup truck campers, and motor homes occupying campsites in Wisconsin State Park System family campgrounds.

    • Camping reservations are required before setting up on any site.
    • A campsite may contain no more than one recreation trailer, pickup truck camper, or motor home.
    • No person may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.
    • Pickup campers or motor homes pulling a trailer are treated as a single unit.

    maximum camping-unit occupancy per campsite: 1 recreation trailer, pickup truck camper, or motor home (Pickup campers or motor homes pulling a trailer are treated as a single unit.) · maximum stay: 14 days in any 21 days

    “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.”
    3 more reviewed findings on this topic
    • Limited — Occupancy of recreational vehicles, including recreation trailers, pickup truck campers, motor homes, camper vans, and truck campers, at Wisconsin State Park System campsites.
      “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit.”
    • Limited — Temporary camping at Wisconsin State Park System properties.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site.”
    • Limited — Temporary camping in Wisconsin State Park System family campgrounds.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days. [...] Not all properties offer camping during non-summer months. Camping seasons vary by property.”
  • county zoning authorityGeneral

    Wisconsin counties may enact and amend county zoning ordinances under Wis. Stat. § 59.69 for participating towns, which are generally unincorporated areas.

    • County zoning applies only in towns that have adopted county zoning.
    • After a comprehensive revision of the county zoning ordinance, the town has authority to decide whether county zoning applies in the town.
    • Towns have authority to approve or disapprove amendments to a county zoning ordinance.
    • A town that does not fall under county zoning may be unzoned or may have its own town zoning ordinance.
    “Counties exercise zoning ordinances under s. 59.69, Wis. Stats. County zoning only applies in towns that have adopted county zoning.”
  • county building authorityGeneral

    Wisconsin county authority to administer construction and inspection of new one- and two-family dwellings, including in unincorporated areas, through the UDC delegation and inspection framework.

    • Counties must have delegated authority to exercise UDC jurisdiction.
    • A county with delegated authority has jurisdiction over new one- and two-family dwellings in cities, villages, and towns that do not have their own delegated authority.
    • The DSPS page directs applicants to the municipality when it has delegated authority and otherwise to DSPS or the appointed county inspector.
    • The authority described is for construction and inspection under the statewide UDC; local zoning, land-use, sanitary, floodplain, and other requirements may still apply.

    covered construction: new one- and two-family dwellings (Jurisdiction depends on DSPS delegation and whether the municipality has its own delegated authority.)

    “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”
    2 more reviewed findings on this topic
    • General — County authority to enforce the statewide Uniform Dwelling Code and administer building inspection and permitting for new one- and two-family dwellings in Wisconsin, including unincorporated areas where the county is the responsible inspection authority.
      “The UDC is primarily enforced by municipal or county building inspectors who must be state-certified. In lieu of local enforcement, municipalities have the option to have the state provide enforcement for just new homes.”
    • Limited — County enforcement of Wisconsin’s Uniform Dwelling Code for new one- and two-family dwellings in municipalities, including towns, that do not have their own delegated authority
      “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”

Set by your township or city, not the county

In Wisconsin, zoning is adopted by each township or city, so Oconto County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Accessory dwellings

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Oconto County, Wisconsin

Is Oconto County a good place to live off-grid or homestead?

Oconto County scores 76/100 on the Bolthole Index, a strong county profile. Its strengths: a stronger property-autonomy legal backdrop and workable self-sufficiency basics: 32.4″/yr rainfall and 61% wooded land.

Do you need a building permit in Oconto County, Wisconsin?

Oconto County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Oconto County Planning, Zoning & Solid Waste Department (Sanitary), under WI DSPS. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Oconto County?

Living in an RV on your own land in Oconto County is limited to specific cases: Recreational vehicles and camping units on private parcels. Permanent habitation is prohibited. Recreational use is limited to 60 consecutive days unless an annual land-use permit and approved sanitary facility are obtained. A tiny home is limited to specific cases. Confirm with the county before relying on it.

How much does land cost in Oconto County, Wisconsin?

Land in Oconto County runs about $5,367 per acre, based on the latest county data.

What is the water situation in Oconto County?

Oconto County gets about 32.4" of rain a year, with severe drought in roughly 0.8% of years.

How remote is Oconto County?

A representative private-land location has about 9,123 people within a 30-minute drive and 1,128,098 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Oconto compares in Wisconsin

Compare side-by-side →See all 72 Wisconsin counties ranked →