Bolthole Index

Shawano County, Wisconsin

Building permits, zoning and land rules in Shawano County, Wisconsin

75Index Score / 100
#18 of 72 in Wisconsin

Shawano County, Wisconsin requires a county land-use permit when a structure is built, moved or structurally altered in an area administered by County Planning & Development; town, state and Uniform Dwelling Code permits may also apply1. General zoning varies by town, but county shoreland jurisdiction covers shoreland areas in every town23. Shawano County Planning & Development issues county land-use and sanitary permits4.

At a glance

Building permit
Required in county-administered areas; town and UDC permits may also apply1
Zoning
General zoning varies by town; county shoreland jurisdiction covers shoreland areas in every town23
Septic
County sanitary permit required for structures with plumbing that use private sewage56
RV living
Not as a residence in county-zoned areas; qualifying temporary living is limited to 30 consecutive days78
Tiny home
No distinct tiny-home occupancy rule confirmed; dwelling size depends on the zoning district91011
Owner-builder
An owner who occupies or will occupy the home may take out construction and erosion-control permits12
Minimum home size
900 sq. ft. for a single-family principal dwelling in the county-zoned R-R, A-R and R-S districts91011
Accessory dwelling
One per lot where county general zoning applies, up to 50 percent of the principal dwelling or 1,000 square feet; RVs and park models do not qualify13

Who to call

Zoning

Shawano County Planning & Development Department

County land-use, structure and shoreland permits; county zoning questions; sanitary permits; E-911 property addresses; and zoning applications

715-526-4634

311 N. Main St Shawano, Wi 54166

Septic permits

Shawano County Planning & Development Department

Review and issuance of Shawano County sanitary permits and inspection of private onsite wastewater treatment systems

715-526-6766

311 N. Main St. Shawano, WI 54166

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in Shawano County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Shawano County, Wisconsin?

A property owner must obtain a Shawano County land-use permit whenever a structure is built, moved or structurally altered in an area administered by County Planning & Development1. Applicants submit a preliminary land-use application, detailed site plan and fee; county staff then identify additional permits or information, and the process can take up to three months depending on the approvals or public hearings involved14. Published county fees vary by approval, and an after-the-fact land-use permit carries a triple fee15. New one- and two-family dwellings, including manufactured homes, are governed by Wisconsin's Uniform Dwelling Code16. Required UDC inspections cover footings, foundation and reinforcement, rough work, insulation and final inspection17. An owner who occupies or will occupy the home may take out the construction and erosion-control permits, but that allowance does not waive code, permit, inspection, plumbing or electrical requirements12. Agricultural buildings do not have a confirmed blanket exemption; ask Planning & Development about the proposed use4.

Who handles building permits in Shawano County, and how do you reach them?

Shawano County Planning & Development handles county land-use and structure permits, shoreland permits, sanitary permits, property addresses and zoning applications4. The office is at 311 N. Main St., Shawano, Wisconsin, and its zoning phone number is 715-526-46344. The county is not the universal issuer of every residential approval: Uniform Dwelling Code permitting and inspection may be handled by a delegated municipality, a delegated county or the Wisconsin Department of Safety and Professional Services18. Start with Planning & Development to identify county approvals, then ask which UDC authority serves the parcel14. The UDC inspector performs the required construction inspections17. Occupancy follows a final inspection with no major health or safety violations; an occupancy permit itself is not universal because only some municipalities issue one19.

Does Shawano County have zoning?

Shawano County general zoning is not countywide, so the answer depends on the town20. County general zoning covers Angelica, Aniwa, Birnamwood, Fairbanks, Germania, Grant, Green Valley, Herman, Maple Grove, Morris, Navarino, Red Springs, Seneca, Washington, Waukechon and Wittenberg2. Almon, Bartelme, Belle Plaine, Hartland, Hutchins, Lessor, Pella, Richmond and Wescott handle general-zoning questions outside county jurisdiction, while villages and cities regulate locally20. County shoreland jurisdiction covers land within 1,000 feet of a navigable lake, pond or flowage and within 300 feet of a navigable river or stream in every town3. Shoreland structures generally sit at least 75 feet from the ordinary high-water mark, subject to exceptions21. In county-zoned R-R, A-R and R-S districts, a single-family principal dwelling needs at least 900 square feet of livable area; shoreland or floodplain standards may be more restrictive91011.

How do septic permits work in Shawano County?

Shawano County Planning & Development reviews and issues sanitary permits and inspects private onsite wastewater treatment systems throughout the county522. A structure with plumbing that uses private sewage needs a sanitary permit23. Before issuance, the parcel needs an assigned property address and a certified soil tester must complete a soil and site evaluation; the fee depends on the system type23. A building intended for human occupancy that has indoor plumbing and no public sewer must use a county-approved POWTS2422. Installation or modification cannot begin before permit issuance, and the licensed installing plumber submits the application and design material6. All systems are subject to county inspection25. Only about 18.1% of Shawano County soils are rated without severe limitations for a conventional drain field, so make wastewater feasibility an early purchase contingency26.

Can you live in an RV or tiny home on your land in Shawano County?

In areas governed by Shawano County zoning, a recreational vehicle may not be used as a residence7. Temporary RV living is limited to 30 consecutive days in districts that permit the use, and the RV must remain road ready with an approved waste-disposal system rather than a permanent connection to a private onsite wastewater system8. Residential districts otherwise prohibit RV placement unless an accessory-use exception or conditional-use permit applies; up to two RVs may be stored on the owner's home premises as an accessory use, but not for habitation or commercial activity8. Outside county zoning jurisdiction, ask the town, village or city for its rule20. We could not confirm a distinct tiny-home occupancy rule. In county-zoned R-R, A-R and R-S districts, however, a single-family principal dwelling needs at least 900 square feet of livable area91011. A manufactured home may qualify as a single-family dwelling in county general-zoning areas when it meets the rules applicable to those dwellings27.

Building a home in Shawano County: the steps, in order

  1. Ask Planning & Development to identify the parcel's zoning, shoreland, wetland and floodplain constraints428.
  1. Confirm access with the authority for the adjoining road and obtain any required driveway culvert permit before completing the property-address application; a property without a 911 address needs a culvert permit even for an existing driveway2930.
  1. If the project will have plumbing and use private sewage, obtain the property address, certified soil evaluation and county sanitary permit14.
  1. Submit the preliminary land-use application, detailed site plan and fee; county staff will identify additional permits or information14.
  1. Identify the UDC authority serving the parcel and obtain the dwelling permit before construction16.
  1. Arrange the required inspections with the UDC inspector17.
  1. Occupy the dwelling only after the final inspection finds no major health or safety violations19.

What should you check before buying land in Shawano County?

Verify whether the parcel is under county general zoning, town zoning or municipal zoning, then check shoreland, floodplain and land-division rules separately20331. Shoreland lots without public sewer generally need at least 20,000 square feet and a 100-foot average width and water frontage, while sewered shoreland lots generally need at least 10,000 square feet and a 65-foot average width and frontage, subject to exceptions32. Building in a floodway is prohibited; building elsewhere in a floodplain may be possible depending on the zone, floodproofing and whether a hydrologic and hydraulic study is required33. Check wastewater feasibility early because only about 18.1% of county soils avoid severe limitations for a conventional drain field26. Confirm road access with the authority for the adjoining road29. A new private well generally requires advance notification to Wisconsin DNR, although a general county well permit was not confirmed34.

Watch-outs

  • A Shawano County land-use permit does not replace a town, state or Uniform Dwelling Code permit that also applies to the project1.
  • General zoning is not countywide, but Shawano County has shoreland jurisdiction in shoreland areas of every town203.
  • A property address and certified soil evaluation must precede the sanitary permit for a structure with plumbing that uses private sewage23.
  • County-zoned land does not allow an RV as a residence; temporary living is limited to 30 consecutive days where the district permits it78.

Sources

  1. Land Use Permits, quoted and re-checked
  2. Shawano County Zoning, quoted and re-checked
  3. Shawano County Zoning, quoted and re-checked
  4. Shawano County Planning & Development Department (co.shawano.wi.us)
  5. Shawano County Private Onsite Wastewater Treatment Systems, quoted and re-checked
  6. Shawano County Building A Structure, quoted and re-checked
  7. Chapter 40 - Zoning, Code of Ordinances, quoted and re-checked
  8. Chapter 40 - Zoning, Code of Ordinances, quoted and re-checked
  9. Sec. 40-69 - Dimensional standards, quoted and re-checked
  10. Sec. 40-69 - Dimensional standards, quoted and re-checked
  11. Sec. 40-69 - Dimensional standards, quoted and re-checked
  12. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  13. Ordinance to Amend Chapter 40 - Zoning of County Code of Ordinances, quoted and re-checked
  14. Land Use Permits, quoted and re-checked
  15. Shawano County Land Use Permits, quoted and re-checked
  16. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  17. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  18. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings) (Wisconsin statewide rule), quoted and re-checked
  19. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  20. Shawano County Zoning, quoted and re-checked
  21. Shawano County Shoreland Zoning Ordinance, quoted and re-checked
  22. Shawano County Planning & Development Department (co.shawano.wi.us)
  23. Building A Structure, quoted and re-checked
  24. Shawano County Private Onsite Wastewater Treatment Systems, quoted and re-checked
  25. Shawano County Private Onsite Wastewater Treatment Systems, quoted and re-checked
  26. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  27. Ordinance to Amend Chapter 40 - Zoning, quoted and re-checked
  28. Zoning Districts, quoted and re-checked
  29. co.shawano.wi.us, quoted and re-checked
  30. Shawano County Building A Structure, quoted and re-checked
  31. Shawano County Zoning, quoted and re-checked
  32. Shawano County Shoreland Zoning Ordinance, quoted and re-checked
  33. Building A Structure, quoted and re-checked
  34. Well and heat exchange notification (Wisconsin statewide rule), quoted and re-checked

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Shawano County requires a building permit for a home.

RuleShawano CountyMenominee CountyWaupaca CountyOutagamie CountyOconto CountyLanglade CountyBrown County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesNo
Septic permitsCounty Planning & DevelopmentCounty Land Conservation/Forestry/ZoningCounty Planning & Zoning OfficeCounty Development & Land ServicesCounty PlanningCounty Land Records & Regulations Dept.County Planning & Land Services

County locator

Shawano County in Wisconsin

75
County map
Shawano County highlighted among the Wisconsin counties · colored by Index score

How Shawano County scores

Seclusion64100% ev.
Self-Sufficiency69100% ev.
Admin Boringness44100% ev.
Durability65100% ev.
Property Autonomy70100% ev.
Carry Cost65100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$281kTypical home
1.4%Property tax
$5,983Land / acre
32.7"Annual rain
0% of yrsSevere drought
1.2 / yr (+1.1)Mid-century 100°F days
13.2 daysMid-century dry spell
1.53" (+10.7%)Mid-century 1-day rain
1.64×Wildfire change factor
100%Forward climate coverage
$1,117Home insurance / yr
1.6% / yrInsurance growth
0.66%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
17,369People within 30 min
1,366,094People within 2 hr
33,281Radius comparison (15 mi)
46People / sq mi
0.2%Federal land
94.1%Land at 15% slope or less
18.1%Soils rated "not limited" for septic (strict USDA rating)
100,901 acWorkable land screen
50.2%Wooded land
42.1 tonsBiomass / forest ac
43.7°FAvg temp

Scout Shawano County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Shawano County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Shawano County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Town of Almon · Town of Angelica · Town of Aniwa · Village of Aniwa · Town of Bartelme · Town of Belle Plaine · Town of Birnamwood · Village of Birnamwood · Village of Bowler · Village of Cecil · Village of Eland · Town of Fairbanks · Town of Germania · Town of Grant · Town of Green Valley · Town of Hartland · Town of Herman · Town of Hutchins · Town of Lessor · Town of Maple Grove · Village of Mattoon · Town of Morris · Town of Navarino · Town of Pella · Town of Red Springs · Town of Richmond · Town of Seneca · Town of Washington · Town of Waukechon · Town of Wittenberg · Village of Wittenberg

Answers from the rulebook for Shawano County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Shawano County rules

  • Building permitRequired

    Structures built, moved, or structurally altered in Shawano County areas subject to county land-use permitting.

    • A Wisconsin Uniform Dwelling Code permit may also be required.
    • Town permits may also apply.
    • After-the-fact county land-use permits are charged a triple fee.
    “A property owner must obtain a land use permit anytime a structure is to be built, moved, or structurally altered.”
    One more reviewed finding on this topic
    • Required — Structures built, moved, or structurally altered in areas administered by Shawano County Planning and Development.
      “A property owner must obtain a land use permit anytime a structure is to be built, moved, or structurally altered.”
  • County-wide zoningPresent (with conditions)

    Shoreland areas of all Shawano County towns and county-administered countywide ordinances.

    • Shoreland jurisdiction covers areas within 1,000 feet of navigable lakes, ponds, and flowages and within 300 feet of navigable rivers and streams.
    • Countywide ordinances listed by the county include POWTS, floodplain, shoreland-wetland zoning, and land division.
    • General county zoning jurisdiction is limited to the towns listed on the county zoning page; villages and cities are excluded from county general zoning jurisdiction.
    “has jurisdiction County-wide with the following Ordinances”
    One more reviewed finding on this topic
    • Present (with conditions) — Shoreland areas throughout all towns in Shawano County.
      “Shawano County has jurisdiction in shoreland areas of all towns. (The shoreland area includes all areas within 1000ft of the ordinary high water mark of navigable lakes, ponds or flowages or within 300ft of the ordinary high water mark of navigable rivers or streams.)”
  • Local zoningVaries (with conditions)

    Aggregate of Shawano County general zoning, town zoning, and incorporated municipality zoning.

    • The county lists 16 towns under Shawano County General Zoning Jurisdiction.
    • The county lists 9 towns outside its general zoning jurisdiction and directs applicants to those towns for general zoning purposes.
    • All villages and cities in Shawano County are not part of Shawano County General Zoning Jurisdiction and regulate locally.
    “Towns not a part of Shawano County General Zoning Jurisdiction”
    One more reviewed finding on this topic
    • Varies (with conditions) — Aggregate of Shawano County general zoning, town zoning, and incorporated municipal zoning.
      “Towns not a part of Shawano County General Zoning Jurisdiction”
  • Zoning districtsPublished (with conditions)

    Shawano County zoning districts and district descriptions.

    • District applicability depends on the parcel's zoning jurisdiction and local zoning authority.
    • The county zoning-district document identifies districts including R-R, A-R, R-S, R-M, H, C-C, C-G, M, and PUD.
    “The R-R district is intended for mainly single family detached residential development on small rural lots, along with compatible home occupations, small-scale institutional and recreational uses, and low-intensity, pre-existing agricultural uses.”
    One more reviewed finding on this topic
    • Published (with conditions) — Published county general-zoning districts and zoning information for areas under county jurisdiction.
      “you can see what your property is zoned.”
  • Minimum dwelling sizeSpecified

    Principal dwellings in the A-R Agricultural-Residential District.

    • The table specifies minimum principal building livable area by dwelling type.
    • SF means single-family dwelling; TF means two-family dwelling.
    • Additional dimensional standards may apply in shoreland and floodplain areas, with the more restrictive standard controlling.

    minimum principal building livable area for single-family dwelling: >= 900 sq. ft. · minimum principal building livable area for two-family dwelling: >= 1200 sq. ft.

    “Minimum principal building livable area (sq. ft.) SF: 900 TF: 1,200”
    2 more reviewed findings on this topic
    • Specified — Principal dwellings in the R-R Residential-Rural District.
      “Minimum principal building livable area (sq. ft.) SF: 900 TF: 1,200”
    • Specified — Principal dwellings in the R-S Residential-Sewered District.
      “Minimum principal building livable area (sq. ft.) SF: 900 TF: 1,200”
  • Minimum lot sizeSpecified

    Shawano County shoreland zoning areas.

    • For lots not served by public sanitary sewer, the minimum lot area is 20,000 square feet and minimum average lot width is 100 feet with at least 100 feet of ordinary-high-water-mark frontage.
    • For lots served by public sanitary sewer, the minimum lot area is 10,000 square feet and minimum average lot width is 65 feet with at least 65 feet of ordinary-high-water-mark frontage.
    • Specified substandard-lot exceptions and variance procedures apply.

    minimum lot area without public sanitary sewer: 20000 sq ft · minimum average lot width without public sanitary sewer: 100 ft · minimum lot area with public sanitary sewer: 10000 sq ft · minimum average lot width with public sanitary sewer: 65 ft

    “The minimum lot area shall be 20,000 sq. ft.”
  • SetbacksSpecified

    Shoreland zoning areas and shoreland setback areas.

    • Buildings and structures generally must be at least 75 feet from the ordinary high-water mark of navigable waters.
    • Certain open-sided or screened structures may be at least 35 feet landward if all listed conditions are met.
    • The shoreland ordinance supplies additional side-yard and variance rules.

    ordinary high-water-mark setback: 75 ft (specified exceptions and average-setback procedures) · nearest-water distance for qualifying open-sided or screened structures: >= 35 ft (structure must meet statutory and county conditions)

    “shall be set back at least 75 feet from the ordinary highwater mark of navigable waters.”
  • Living in an RVProhibited

    Use of a recreational vehicle as a residence in areas governed by Shawano County zoning.

    • A recreational vehicle may not be used as a residence.
    • In a residential zoning district, placement is otherwise prohibited unless the accessory-use exception in subsection (3) or a conditional use permit applies.
    • The county zoning ordinance does not govern incorporated cities, villages, or towns outside the county zoning jurisdiction.
    “No recreational vehicle shall be used as a residence.”
    One more reviewed finding on this topic
    • Temporary only (with conditions) — Temporary parking and temporary living in recreational vehicles in county-zoned districts that permit the use.
      “Recreational vehicles may be used for temporary parking and temporary living purposes in those districts that permit such use and must remain road ready at all times. No recreational vehicle shall be used as a residence. Temporary living purposes shall be considered to be a period of 30 consecutive days.”
  • Manufactured homesAllowed (with conditions)

    Manufactured homes treated as single-family dwellings in Shawano County general-zoning areas.

    • The manufactured home must meet regulations applicable to all single-family dwellings.
    • The source applies to county general-zoning areas and does not establish rules for municipalities outside county general zoning.
    “it does include manufactured homes [...] if the manufactured home meets the following regulations that are applicable to all single-family dwellings.”
  • Accessory dwellingsLimited

    Accessory dwelling units governed by Shawano County Chapter 40 in areas subject to county zoning, including county-regulated unincorporated areas.

    • In the FP zoning district, the unit must also meet farm-residence requirements and may be limited by the associated town board to occupancy by a parent or child of the farmer.
    • The unit may not be a travel trailer, recreational vehicle, camping unit, mobile home, bus, truck storage container, park model, or similar manufactured unit not originally intended for permanent residence.
    • The unit must have its own private on-site wastewater treatment system and minimally constitute one bedroom under Wis. Admin. Code ch. SPS 383.
    • The unit may not exceed 50 percent of the principal dwelling's livable area or 1,000 square feet.
    • No more than one accessory dwelling unit is allowed per lot.
    • The lot owner must occupy either the principal or accessory dwelling as a primary residence for at least 180 days per calendar year.
    • Vehicle ingress and egress must share the primary dwelling's legal access; no new access may be established, but a separate address is required.
    • The unit may not be sold or transferred separately from the principal dwelling unit.
    • Registration must be filed and recorded with the county register of deeds, with a notice running with the land.
    • All villages and cities, and nine listed towns, are outside Shawano County General Zoning Jurisdiction and may have separate local rules.

    maximum percentage of principal dwelling livable area: <= 50 percent · maximum accessory dwelling area: <= 1000 square feet · maximum units per lot: <= 1 unit · owner primary-residence occupancy: >= 180 days per calendar year

    “The accessory dwelling unit use shall meet the following performance standards: [...] (4) The accessory dwelling unit shall not exceed 50 percent of the livable area of the principal dwelling unit and shall not exceed 1,000 square feet in area. (5) There shall be no more than one accessory dwelling unit allowed per lot.”
  • Who permits septicCounty

    Private onsite wastewater treatment systems in Shawano County.

    • The county department reviews, issues sanitary permits, and inspects POWTS.
    • The program covers conventional, in-ground pressure, mound, at-grade, holding tank, and other private sewage systems.
    “responsible for the review and issuance of sanitary permits”
    One more reviewed finding on this topic
    • County (with conditions) — Private onsite wastewater treatment permitting and administration in Shawano County.
      “The Shawano County Planning & Development Department is responsible for the review and issuance of sanitary permits and inspection of all POWTS.”
  • Septic permitRequired

    Structures with plumbing and private onsite wastewater systems in Shawano County.

    • A sanitary permit is required for structures with plumbing.
    • A 911 address is required for the application.
    • A properly licensed plumber must complete and submit the application in the ordinary case.
    • Buildings with inside plumbing intended for human habitation or occupancy and not served by public sewer must have an approved POWTS.
    “A sanitary permit is required for all structures which will have plumbing in it. This will require hiring a plumber to complete the sanitary permit application, a 911 address is required to complete this application, and the plumber will need to submit the application to the County. The fee is based off of the type of system to be installed and the review required.”
    One more reviewed finding on this topic
    • Required — Structures with plumbing using private sewage systems in Shawano County.
      “A sanitary permit is required for all structures which will have plumbing in it.”
  • Septic inspectionRequired

    POWTS in Shawano County.

    • The county is responsible for inspection of all POWTS.
    • The exact inspection timing and maintenance intervals were not located on the opened page.
    “The Shawano County Planning & Development Department is responsible for the review and issuance of sanitary permits and inspection of all POWTS.”
  • Off-grid sanitationLimited

    Private sanitation for occupied buildings without public sanitary sewer.

    • A compliant POWTS is required for buildings with inside plumbing not served by public sanitary sewer.
    • For hunting, fishing, or recreational structures, a Privy Permit or Non-Plumbing Toilet Permit is required from the county.
    “a Privy Permit or Non-Plumbing Toilet Permit is required”
  • Mandatory utility hookupConditional

    Buildings with inside plumbing in Shawano County.

    • If not served by public sanitary sewer, a building intended for human habitation or occupancy must be served by an approved POWTS.
    • The opened official pages did not establish a general countywide requirement to connect to public water or sewer where available.
    “All buildings in Shawano County that are permanently or intermittently intended for human habitation or occupancy that contain inside plumbing and are NOT served by public sanitary sewer shall be served by a POWTS that is approved by the Shawano County Planning & Development Department.”
  • Subdividing landRegulated (with conditions)

    Land division and subdivision activity in Shawano County.

    • The county identifies Land Division as SCCO Chapter 20 and lists it among county-administered ordinances.
    • Additional municipal or state requirements may apply depending on the project.
    “In addition, the Shawano County Planning and Development Department has jurisdiction County-wide with the following Ordinances: POWTS (Private On-Site Wastewater Treatment System Ordinance), Non-Metallic Mining Ordinance, Floodplain Ordinance, Shoreland-Wetland Zoning Ordinance, Land Division Ordinance, 911 Uniform Property Numbering System Ordinance, and Citation Authority Ordinance.”
  • Driveway accessRequired

    Access to a property requiring a 911 address in Shawano County.

    • If there is no existing driveway and 911 address, contact the appropriate Town, County, or State authority for a driveway culvert permit and complete the 911-address process.
    • Even an existing driveway requires a driveway culvert permit if there is no 911 address.
    • The actual permitting authority varies by road jurisdiction.
    “required to get a driveway culvert permit”
    One more reviewed finding on this topic
    • Limited — Driveway and culvert access for properties seeking a 911 address in Shawano County.
      “Driveways on a state or federal highway contact Wisconsin Dept. of Transportation 715-365-5752”
  • Building in a floodplainLimited

    Development in Shawano County floodways and floodplains.

    • Building in a floodway is prohibited.
    • Building in a floodplain may be possible depending on the flood zone and appropriate steps such as floodproofing.
    • An H&H or Hydrologic and Hydraulic study may be required depending on the flood zone.
    “Building of structures in a flood way is prohibited”
    One more reviewed finding on this topic
    • Limited — Development in Shawano County floodways and floodplains.
      “Building of structures in a flood way is prohibited, building in a floodplain may be possible depending on the zone, and if appropriate steps are followed such as flood proofing.”
  • Permit feesPublished (with conditions)

    Shawano County land-use permits and sanitary permits.

    • The land-use page directs applicants to the Fee Schedule for Ordinances & Services.
    • After-the-fact land-use permits are charged a triple fee.
    • Sanitary-permit fees vary with the type of system and review required.
    “See Fee Schedule for Ordinances & Services”
  • Permit processPublished (with conditions)

    County-administered land-use and related sanitary permitting process in Shawano County, subject to parcel location, zoning jurisdiction, permit type, and any required town, state, or federal approvals.

    • Submit the Preliminary Land Use Application Form to the department.
    • After review, county staff identify permits and additional information needed.
    • A sanitary permit is required before a county land-use permit can be issued when applicable; structures with plumbing require a sanitary permit.
    • A 911 address/fire number is required before a sanitary permit can be issued; a certified soil tester must perform the soil and site evaluation; and the licensed plumber must complete the sanitary application and obtain plan approval.
    • The land-use submission includes a detailed site plan showing existing and proposed structures and setbacks; additional plans or studies may be required based on location and use.
    • A majority of permits may require an on-site visit, and the process may take up to three months depending on permits or public hearings.
    • Conditional-use and variance procedures require public hearings and generally take longer because of state posting requirements.
    • Town permits, Wisconsin administrative building permits, and Uniform Dwelling Code permits may also be required.

    maximum stated process duration: <= 3 months (County page says duration depends on permits and/or public hearings required.)

    “Please complete the Preliminary Land Use Application Form under Zoning on our Forms and Documents page and return it to our department. Once the department reviews the Preliminary Land Use Application form, a member of the department will contact you with what permit(s) may be needed for the project, and any additionally required information that may be needed to complete the permitting process.”
    2 more reviewed findings on this topic
    • Partial — County land-use permitting for building projects in Shawano County.
      “Once the department reviews the Preliminary Land Use Application form, a member of the department will contact you with what permit(s) may be needed for the project, and any additionally required information that may be needed to complete the permitting process.”
    • Published (with conditions) — County land-use permitting for construction or relocation projects.
      “Please complete the Preliminary Land Use Application Form”

Wisconsin rules that apply here

  • Owner-builder exemptionConditional

    An owner obtaining construction and erosion-control permits for a dwelling covered by the Wisconsin Uniform Dwelling Code.

    • The owner must occupy the home currently or will occupy it after completion.
    • The exemption permits the owner to take out the construction and erosion-control permits without the state-certified Dwelling Contractor and Dwelling Contractor Qualifier arrangement described for contractors.
    • The owner-occupancy statement must be checked on the permit application if the applicant does not possess Dwelling Contractor certification.
    • The source describes an owner-occupancy condition; it does not establish a general exemption for non-occupant owners.
    “The construction and erosion control permits must be taken out by a state-certified Dwelling Contractor, who also employs a state-certified Dwelling Contractor Qualifier, or by the owner who occupies the home currently or will after completion.”
    One more reviewed finding on this topic
    • Available (with conditions) — Construction and erosion-control permits for an owner-occupied or future owner-occupied dwelling.
      “The construction and erosion control permits must be taken out by a state-certified Dwelling Contractor, who also employs a state-certified Dwelling Contractor Qualifier, or by the owner who occupies the home currently or will after completion.”
  • Building code adoptedAdopted (with conditions)

    Public buildings, places of employment, and multifamily buildings subject to Wisconsin's commercial building code.

    • The Division of Industry Services reviews plans before construction for compliance with state statutes and building codes.
    • Local certified municipalities may provide plan review and inspection services for certain building types.
    • The Wisconsin Commercial Building Code adopted the 2021 ICC effective September 1, 2025; plans submitted November 1, 2025 or later must comply with the updated code.
    • Municipalities may have grandfathered fire detection, prevention, and suppression ordinances under 2013 Act 270.

    2021 ICC adoption date: September 1, 2025 (The deadline for building plan compliance was delayed.) · updated-code plan-submission deadline: November 1, 2025 (Plans submitted on or after this date must comply with the updated Commercial Building Code.)

    “2013 Act 270 establishes a uniform commercial building code in Wisconsin while allowing municipalities to grandfather fire detection, prevention, and suppression ordinances”
    5 more reviewed findings on this topic
    • Adopted (with conditions) — New one- and two-family dwellings in Shawano County, including manufactured homes.
      “The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code. Enforces construction standards and inspection procedures including evaluation of building materials.”
    • Adopted — New one- and two-family dwelling units, including stick-built, modular, and manufactured-home installations in Wisconsin.
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
    • Adopted (with conditions) — New one- and two-family dwellings in Wisconsin built since June 1, 1980.
      “The Uniform Dwelling Code (UDC) is the statewide building code for one- and two-family dwellings built since June 1, 1980.”
    • Adopted (with conditions) — New Wisconsin one- and two-family dwelling construction, including stick-built, modular, and manufactured home installations
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
    • Adopted — Wisconsin's Uniform Dwelling Code, chapters SPS 320-325, for new one- and two-family dwelling units, including stick-built, modular, and manufactured home installations.
      “SPS 320-325 Uniform Dwelling Code (UDC), construction standard for 1-2 family dwelling units, applies uniformly statewide”
  • InspectionsRequired

    Each phase of construction of a one- or two-family dwelling governed by the Wisconsin Uniform Dwelling Code.

    • Inspections are called for before each phase is covered up.
    • The local inspector’s instructions apply.
    • The inspector has two business days after the inspection request and the work being ready to inspect before the work may be covered.
    • Inspections check compliance with the code and may also check compliance with approved plans.
    • The UDC is enforced by municipal or county building inspection departments or the Wisconsin Division of Industry Services.

    inspection response period: 2 business days (After the inspection request and the work is ready to inspect, before the work may be covered up.)

    “Call for inspections of each phase of construction prior to covering it up - check the local inspector’s instructions. The inspector has two business days after the date that you make the inspection request and the work is ready to inspect, before you may cover up the work. Inspectors will check for compliance with the code.”
    2 more reviewed findings on this topic
    • Required — New one- and two-family dwellings in Wisconsin, including Shawano County.
      “The following inspections are required on new one- and two-family dwellings.”
    • Required — New one- and two-family dwellings under the Wisconsin Uniform Dwelling Code.
      “The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
  • Certificate of occupancyLimited

    UDC-covered one- and two-family dwellings.

    • Occupancy follows a final inspection with no major health or safety violations.
    • Some municipalities issue occupancy permits; the state brochure does not make an occupancy permit universal.
    • The dwelling exterior must be completed within two years after permit issuance.

    exterior completion deadline: 2 years after permit issuance

    “Take occupancy after receiving a final inspection”
    One more reviewed finding on this topic
    • Limited — Occupancy of a dwelling governed by Wisconsin’s Uniform Dwelling Code after construction.
      “Take occupancy after receiving a final inspection in which no major health or safety violations are found. (Some municipalities will issue occupancy permits.) Also, the dwelling’s exterior must be completed within two years after permit issuance.”
  • Lot coverageSpecified

    Impervious-surface coverage in the statewide shoreland framework and the DNR county model ordinance for qualifying shoreland lots or parcels.

    • The general standard applies to construction, reconstruction, expansion, replacement, or relocation of impervious surfaces within 300 feet of the ordinary high-water mark on riparian lots and parcels entirely within 300 feet of the ordinary high-water mark.
    • The general standard is 15 percent.
    • A lot or parcel may exceed 15 percent but not exceed 30 percent with a permit and mitigation plan.
    • For highly developed shorelines, counties are not required to adopt the special standards; if adopted, residential coverage may exceed 30 percent but not exceed 40 percent with a mitigation plan.
    • Treated impervious surfaces and defined roadways and sidewalks may be excluded from calculation when the ordinance conditions are met.

    general impervious-surface limit: <= 15 percent of lot or parcel · maximum under general standard with mitigation: 30 percent of lot or parcel (permit and mitigation plan required) · highly developed shoreline residential maximum: 40 percent of lot or parcel (special standard adopted and mitigation plan required)

    “The percentage of impervious surface allowed on a lot or parcel described under section 11.2 and as calculated under section 11.3 shall not exceed 15%.”
  • Building heightSpecified

    Structures within 75 feet of the ordinary high water mark of navigable waters in Wisconsin shoreland zoning areas.

    • The DNR model ordinance identifies this as the NR 115.05(1)(f) height standard for county shoreland ordinances.
    • The prohibition does not extend beyond 75 feet from the ordinary high water mark under the stated standard.
    • Counties may regulate height beyond 75 feet through local ordinance.

    maximum structure height within 75 feet of ordinary high water mark: <= 35 feet (A structure taller than 35 feet is prohibited within the specified area.)

    “A structure taller than 35 feet within 75 feet of the ordinary high-water mark of any navigable waters is prohibited”
  • Well permitLimited

    Construction of private wells statewide in Wisconsin.

    • A Well Construction Notification Number must be obtained before constructing a new private well that is not a high-capacity well.
    • Exceptions to the notification requirement include high-capacity wells, reconstruction of existing wells, and wells on Native American property; high-capacity wells or other wells requiring written DNR approval follow the approval requirements.
    • Some DNR-approved county ordinances additionally require a well permit before construction.
    • A Well Construction Report must be submitted to DNR within 30 days after construction.

    well construction notification fee: 50.5 USD (Fee and notification number are not refundable or transferable.) · well construction report deadline: 30 days after construction

    “Wisconsin law requires that a property owner provide advance notice to DNR before construction of any new private well that is not a high capacity well, and advance notice of any heat exchange drillhole construction (geothermal system) that does not require a written DNR approval.”
  • Agricultural exemptionConditional

    Wisconsin farmland preservation zoning districts and farmland preservation agreements; these are conditional agricultural-use protections and tax-credit frameworks, not a blanket exemption from local land-use or land-division ordinances.

    • Certified farmland preservation zoning districts limit land uses to agriculture and other compatible uses.
    • Local ordinances are crafted locally and must meet or be more restrictive than Chapter 91 standards.
    • A farmland preservation agreement requires land to remain in agricultural use for 10 years and comply with state soil and water conservation standards.
    • Agreement eligibility requires ownership of the farmland, location in a designated Agricultural Enterprise Area, at least $6,000 gross farm revenue during the last year or $18,000 during the last three years, and compliance with applicable conservation standards.
    • A certificate of compliance from the county land conservation committee is required to show compliance.
    • Other local zoning and land-division ordinances continue to apply.
    • A covered agreement provides exemption from special assessments for sanitary sewer or water imposed by specified local governmental entities.
    • Releases before expiration require written consent, a DATCP finding that agricultural use of other protected farmland will not be impaired, and payment of the specified conversion fee.

    farmland preservation agreement term: 10 years (agreements effective before December 8, 2023, were minimum 15-year agreements) · minimum gross farm revenue during last year: >= 6000 USD (alternative test of $18,000 during the last three years) · minimum gross farm revenue during last three years: >= 18000 USD (alternative to the $6,000 last-year test) · tax credit: $10.00 per acre or $12.50 per acre if also in a certified farmland preservation zoning district (other eligibility requirements apply)

    “Remember that other local ordinances (such as zoning and land division ordinances) continue to apply to your land, regardless of whether you sign an agreement.”
  • Short-term rentalsLimited

    Lodging rented to tourists or transients for short periods in Wisconsin, including homes, condos, cabins, cottages, and similar lodging facilities.

    • A DATCP lodging permit is required for all lodging facilities in Wisconsin.
    • A tourist or transient must be away from the person's permanent address.
    • The reviewed source does not establish local zoning or municipal operating restrictions.
    “If lodging is rented to a tourist or transient, it will require a permit.”
  • Campground & park staysLimited

    Recreational trailers, pickup truck campers, and motor homes occupying campsites in Wisconsin State Park System family campgrounds.

    • Camping reservations are required before setting up on any site.
    • A campsite may contain no more than one recreation trailer, pickup truck camper, or motor home.
    • No person may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.
    • Pickup campers or motor homes pulling a trailer are treated as a single unit.

    maximum camping-unit occupancy per campsite: 1 recreation trailer, pickup truck camper, or motor home (Pickup campers or motor homes pulling a trailer are treated as a single unit.) · maximum stay: 14 days in any 21 days

    “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.”
    3 more reviewed findings on this topic
    • Limited — Occupancy of recreational vehicles, including recreation trailers, pickup truck campers, motor homes, camper vans, and truck campers, at Wisconsin State Park System campsites.
      “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit.”
    • Limited — Temporary camping at Wisconsin State Park System properties.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site.”
    • Limited — Temporary camping in Wisconsin State Park System family campgrounds.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days. [...] Not all properties offer camping during non-summer months. Camping seasons vary by property.”
  • county zoning authorityGeneral

    Wisconsin counties may enact and amend county zoning ordinances under Wis. Stat. § 59.69 for participating towns, which are generally unincorporated areas.

    • County zoning applies only in towns that have adopted county zoning.
    • After a comprehensive revision of the county zoning ordinance, the town has authority to decide whether county zoning applies in the town.
    • Towns have authority to approve or disapprove amendments to a county zoning ordinance.
    • A town that does not fall under county zoning may be unzoned or may have its own town zoning ordinance.
    “Counties exercise zoning ordinances under s. 59.69, Wis. Stats. County zoning only applies in towns that have adopted county zoning.”
  • county building authorityGeneral

    Wisconsin county authority to administer construction and inspection of new one- and two-family dwellings, including in unincorporated areas, through the UDC delegation and inspection framework.

    • Counties must have delegated authority to exercise UDC jurisdiction.
    • A county with delegated authority has jurisdiction over new one- and two-family dwellings in cities, villages, and towns that do not have their own delegated authority.
    • The DSPS page directs applicants to the municipality when it has delegated authority and otherwise to DSPS or the appointed county inspector.
    • The authority described is for construction and inspection under the statewide UDC; local zoning, land-use, sanitary, floodplain, and other requirements may still apply.

    covered construction: new one- and two-family dwellings (Jurisdiction depends on DSPS delegation and whether the municipality has its own delegated authority.)

    “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”
    2 more reviewed findings on this topic
    • General — County authority to enforce the statewide Uniform Dwelling Code and administer building inspection and permitting for new one- and two-family dwellings in Wisconsin, including unincorporated areas where the county is the responsible inspection authority.
      “The UDC is primarily enforced by municipal or county building inspectors who must be state-certified. In lieu of local enforcement, municipalities have the option to have the state provide enforcement for just new homes.”
    • Limited — County enforcement of Wisconsin’s Uniform Dwelling Code for new one- and two-family dwellings in municipalities, including towns, that do not have their own delegated authority
      “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”

Set by your township or city, not the county

In Wisconsin, zoning is adopted by each township or city, so Shawano County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Camping on your land
  • Tiny homes

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Shawano County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from Wisconsin’s water agency.

Actively managed

This basin is under active state management — new water use is scrutinized, though a domestic well is usually still allowed.

Household wellExempt — no permit or water right

Reasonable-use rule with a DNR high-capacity-well overlay (Wis. Stat. 281.34). Residential wells are statutorily excluded from the 'high capacity well' definition, so a household well needs no DNR withdrawal approval (NR 812 construction code still applies).

Limit: household wells exempt; only 'high capacity' wells (>100,000 gpd) need DNR approval

Wisconsin DNR — High Capacity Wells ↗
  • Central Sands region (high-capacity-well constraint)partial of county

    Sand-plain region with 3,000+ high-capacity irrigation wells whose pumping draws down lakes, trout streams and wetlands (Central Sands Lakes Study). New high-capacity (>100,000 gpd) wells get case-by-case DNR review; domestic/household wells remain exempt.

    Wisconsin DNR — Central Sands Lakes Study ↗

Regulated-riparian state (large uses permitted). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the Wisconsin state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Shawano County, Wisconsin

Is Shawano County a good place to live off-grid or homestead?

Shawano County scores 75/100 on the Bolthole Index, a strong county profile. Its strengths: a stronger property-autonomy legal backdrop and workable self-sufficiency basics: 32.7″/yr rainfall and 50.2% wooded land.

Do you need a building permit in Shawano County, Wisconsin?

Shawano County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Shawano County Planning & Development, Zoning & Land Use Control (Sanitation) Division. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Shawano County?

Living in an RV on your own land in Shawano County is prohibited: Use of a recreational vehicle as a residence in areas governed by Shawano County zoning. A recreational vehicle may not be used as a residence. In a residential zoning district, placement is otherwise prohibited unless the accessory-use exception in subsection (3) or a conditional use permit applies. Confirm with the county before relying on it.

How much does land cost in Shawano County, Wisconsin?

Land in Shawano County runs about $5,983 per acre, based on the latest county data.

What is the water situation in Shawano County?

Shawano County gets about 32.7" of rain a year, with severe drought in roughly 0% of years. On water rights, Shawano County lies in the Central Sands region (high-capacity-well constraint) — Sand-plain region with 3,000+ high-capacity irrigation wells whose pumping draws down lakes, trout streams and wetlands (Central Sands Lakes Study). New high-capacity (>100,000 gpd) wells get case-by-case DNR review; domestic/household wells remain exempt..

How remote is Shawano County?

A representative private-land location has about 17,369 people within a 30-minute drive and 1,366,094 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Shawano compares in Wisconsin

Compare side-by-side →See all 72 Wisconsin counties ranked →