Bolthole Index

Richland County, Wisconsin

Building permits, zoning and land rules in Richland County, Wisconsin

74Index Score / 100
#21 of 72 in Wisconsin

Unincorporated Richland County, Wisconsin requires a Uniform Dwelling Code building permit for every new one- or two-family home; additions require one in certain townships.1 County land-use permits apply in participating townships, while the Zoning & Sanitation Department handles sanitary permits in unincorporated areas and incorporated areas without their own sanitary code.23 Start with that department for county approvals and the township UDC inspector for the building permit.4

At a glance

Building permit
Required for every new one- or two-family dwelling1
Zoning
County land-use permits apply in listed townships; local authority varies elsewhere2
Septic
A county sanitary permit is required in the county ordinance jurisdiction5
Owner-builder
An owner who occupies or will occupy the home may take out the permits6
RV living
Campground stays are limited; private-land RV living remains unconfirmed78
Tiny homes
Cabins count as dwellings; minimum floor area depends on the zoning district9
Private well
Advance notice to Wisconsin DNR is generally required before construction10

Who to call

Zoning

Richland County Zoning & Sanitation Department

County zoning, land-use, shoreland, floodplain, subdivision and sanitation questions

608-647-2447

zoning@co.richland.wi.us

181 W. Seminary Street, Richland Center, WI 53581

Online permits →

Building permits

Richland County Zoning & Sanitation Department

Published county land-use permit sequence and township UDC-inspector direction

Septic permits

Richland County Zoning & Sanitation Department

New and replacement septic-system approvals and POWTS maintenance tracking

Richland County Courthouse, 181 W. Seminary Street, Room 100, Richland Center, WI 53581

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in Richland County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Richland County, Wisconsin?

Yes. Every new one- or two-family dwelling in Richland County needs a Uniform Dwelling Code building permit; additions also need one in certain townships.11 Wisconsin's UDC applies to new one- and two-family dwellings, including stick-built, modular and manufactured-home installations.12 The UDC is enforced in all Wisconsin municipalities.13 Construction may begin only after plans are approved and the building permit is issued and posted.14

The UDC building permit is separate from county land-use and sanitary permits.15 Contact the inspector serving the parcel for the UDC permit, and use the Zoning & Sanitation Department for applicable county approvals.4 Permit requirements for alterations and additions vary by municipality, so confirm the scope before ordering materials.16

Who handles building permits in Richland County?

For rural Richland County building permits, the county directs applicants to the UDC inspector serving the project’s township; the Zoning & Sanitation Department handles county land-use review.4 The department can be reached at 608-647-2447 or zoning@co.richland.wi.us at 181 W. Seminary Street, Richland Center, WI 53581.8 Where local UDC authority is not approved, the DSPS-appointed inspector applies.17

UDC inspections cover footings, foundation and reinforcement, rough construction, insulation and the final inspection; notify the inspector identified on the building permit before covering work.1819 An owner who currently occupies or will occupy the home may take out construction and erosion-control permits without Dwelling Contractor Certification; required building permits and licensed-trade requirements still apply.2021

Does Richland County have zoning?

For unincorporated land, Richland County enforces comprehensive zoning, shoreland, subdivision and floodplain rules, but general land-use authority varies by location.22 The county issues land-use permits in Akan, Buena Vista, Dayton, Eagle, Forest, Henrietta, Marshall, Orion, Richland, Richwood, Westford and Willow townships; Ithaca and Rockbridge have separate local contacts.2 Confirm the parcel’s land-use authority with the Zoning & Sanitation Department before filing.8

Every township remains under county-administered floodplain, shoreland and wetland zoning.4 Minimum dwelling floor area and structural setbacks depend on the applicable zoning district.923 In unincorporated shoreland areas, buildings generally must sit at least 75 feet from the ordinary high-water mark, subject to exceptions and setback averaging.24

How do septic permits work in Richland County?

Richland County requires a separate sanitary permit for each private wastewater or non-plumbing sanitation system in unincorporated areas and incorporated areas without their own sanitary code.53 Begin with a certified soil tester; a plumber submits the sanitary-permit application and plans to the Zoning & Sanitation Department, with a maintenance agreement registered on the deed.2526 The county lists a $550 sanitary-permit fee and notes that a state plan may be required; the published process generally takes 2 to 6 weeks.2725

Only 6.1% of county soils are rated without severe limitations for a conventional septic drain field, so make the soil test and system design a purchase contingency.28 Where public sewer is available, plumbing fixtures must connect to it; otherwise, a private sewage system must be installed before water service connects to a structure with plumbing.29 A new dwelling using private onsite wastewater cannot receive its UDC building permit until the sanitary permit is issued.16 Existing septic systems require proof of checking or pumping every three years.25

Can you live in an RV or tiny home in Richland County?

We could not confirm permission for long-term RV living or temporary camping on private land in Richland County; ask the Zoning & Sanitation Department about the parcel and proposed use.8 County-regulated trailer camps and campgrounds limit a unit’s stay on one site to 30 days, with an extension not exceeding 60 days.7 Floodplain campgrounds have additional highway-ready-unit, land-use-permit and removal requirements; their separate 180-day continuous-occupancy limit does not establish permission to live in an RV on a private parcel.30

Richland County treats cabins as dwellings, with minimum floor area varying by zoning district; ask the Zoning Office for the parcel’s minimum before choosing a tiny-home plan.31 A habitable cabin without interior plumbing or running water requires a county-approved non-plumbing sanitation system.32 The system must be NSF approved, with a notarized maintenance agreement recorded on the deed and submitted with the sanitary-permit application; sanitary approval comes before the land-use permit.3334

Building a home in Richland County: what are the steps?

For a rural home project, use this order:

  1. Ask the Zoning & Sanitation Department to identify the zoning authority, district, land-use requirements and UDC inspector.24
  2. File the soil test and obtain the sanitary permit before the building permit is issued.3516
  3. Obtain access approval from WisDOT for a state road, the County Highway Department for a county road or the town chairman for a town road; any required driveway permit comes before the land-use permit.36
  4. Obtain the land-use permit and county address sign, then apply for the UDC building permit through the inspector’s required process; some municipalities use their own applications rather than Wisconsin’s eSLA system.3738
  5. Wait for all required approvals before construction starts.35
  6. Request the required UDC inspections and occupy only after a final inspection finds no major health or safety violations.3940

What should you check before buying land in Richland County?

Before buying rural Richland County land, ask the Zoning & Sanitation Department to confirm the proposed use and structural setbacks.23 For lots in a county subdivision, direct access to public streets is required; private roads or easements cannot provide the proposed subdivision access.41 Only 39.5% of county land has a slope of 15% or less, and only 6.1% of soils avoid severe conventional-drain-field limitations, so buildable-area and soil-test contingencies are useful.4228

Wisconsin generally requires advance notice to DNR before private-well construction, with exceptions and separate high-capacity-well approvals.10 Ask the county zoning office about unconfirmed county well-permit and floodplain-development details.8 County-zoned mobile home parks require a conditional use permit and at least 5 acres; that park minimum is not a general residential-lot minimum.43 The county’s median property-tax bill is $2,579 per year, with an effective rate of 1.4%.4445

Watch-outs

  • All Richland County townships have county-administered floodplain, shoreland and wetland zoning, even where general land-use authority differs.4
  • Do not assume a small cabin escapes dwelling rules; Richland County treats cabins as dwellings and varies minimum floor area by zoning district.9
  • Campground RV limits do not confirm permission for private-land RV living; ask the Zoning & Sanitation Department about the specific parcel.78
  • A required driveway permit must be secured from the responsible state, county or town road authority before the county land-use permit can be issued.36

Sources

  1. Land Use - Richland County, WI, quoted and re-checked
  2. Land Use - Richland County, WI, quoted and re-checked
  3. Private On-Site Wastewater Treatment System Ordinance, quoted and re-checked
  4. Richland County Zoning & Sanitation Department (richlandcountywi.gov)
  5. Private On-Site Wastewater Treatment System Ordinance, quoted and re-checked
  6. Instructions for Submitting a UDC Permit Application, quoted and re-checked
  7. Richland County Code, Sec. 119.04.030, Special uses, quoted and re-checked
  8. Richland County Zoning & Sanitation Department (richlandcountywi.gov)
  9. Land Use - Richland County, WI, quoted and re-checked
  10. Well and heat exchange notification (Wisconsin statewide rule), quoted and re-checked
  11. Land Use - Richland County, WI, quoted and re-checked
  12. UDC (Uniform Dwelling Code / One- and Two- Family Dwellings), quoted and re-checked
  13. One- & Two-Family (Uniform Dwelling Code), quoted and re-checked
  14. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  15. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  16. Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
  17. Delegated Agents for Uniform Dwelling Code (UDC) and for Camping Units Permitting and Inspection - DSPS, quoted and re-checked
  18. UDC (Uniform Dwelling Code / One- and Two- Family Dwellings), quoted and re-checked
  19. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  20. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  21. Instructions for Submitting a UDC Permit Application, quoted and re-checked
  22. Zoning - Richland County, WI, quoted and re-checked
  23. Zoning - Richland County, WI, quoted and re-checked
  24. Wisconsin’s Shoreland Management Program (Wisconsin statewide rule), quoted and re-checked
  25. Richland County Zoning & Sanitation Department (richlandcountywi.gov)
  26. Land Use - Richland County, WI, quoted and re-checked
  27. richlandcountywi.gov, quoted and re-checked
  28. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  29. Private On-Site Wastewater Treatment System Ordinance, quoted and re-checked
  30. Richland County Code, Sec. 107.04.080, Public or private campgrounds, quoted and re-checked
  31. Land Use - Richland County, WI, quoted and re-checked
  32. Private On-Site Wastewater Treatment System Ordinance, quoted and re-checked
  33. Land Use - Richland County, WI, quoted and re-checked
  34. Land Use - Richland County, WI, quoted and re-checked
  35. Land Use - Richland County, WI, quoted and re-checked
  36. Land Use - Richland County, WI, quoted and re-checked
  37. Land Use - Richland County, WI, quoted and re-checked
  38. Instructions for Submitting a UDC Permit Application, quoted and re-checked
  39. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  40. Wisconsin’s Uniform Dwelling Code, quoted and re-checked
  41. zoning.co.richland.wi.us, quoted and re-checked
  42. Share of land at 15% slope or less: Bolthole Index county data
  43. Richland County Code, Sec. 119.04.030, Special uses, quoted and re-checked
  44. Median property tax bill: Bolthole Index county data
  45. Effective property tax rate: Bolthole Index county data

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Richland County requires a building permit for a home.

RuleRichland CountyCrawford CountyIowa CountyVernon CountySauk CountyGrant CountyMonroe County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsCounty Zoning & Sanitation Dept.County Land ConservationCounty Office of Planning & DevelopmentCounty Zoning & Sanitarian Dept.County Land Resources & Env. Dept.County ConservationCounty Zoning Dept.

County locator

Richland County in Wisconsin

74
County map
Richland County highlighted among the Wisconsin counties · colored by Index score

How Richland County scores

Seclusion68100% ev.
Self-Sufficiency64100% ev.
Admin Boringness44100% ev.
Durability63100% ev.
Property Autonomy70100% ev.
Carry Cost67100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$279kTypical home
1.4%Property tax
$4,770Land / acre
37.1"Annual rain
7.3% of yrsSevere drought
2.2 / yr (+2.2)Mid-century 100°F days
13.7 daysMid-century dry spell
1.68" (+5.1%)Mid-century 1-day rain
1.75×Wildfire change factor
100%Forward climate coverage
$1,215Home insurance / yr
2.4% / yrInsurance growth
0.72%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
18,710People within 30 min
1,407,715People within 2 hr
22,490Radius comparison (15 mi)
29.3People / sq mi
0%Federal land
39.5%Land at 15% slope or less
6.1%Soils rated "not limited" for septic (strict USDA rating)
22,745 acWorkable land screen
50.6%Wooded land
42.2 tonsBiomass / forest ac
46.2°FAvg temp

Scout Richland County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Richland County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Richland County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Town of Akan · Town of Bloom · Village of Boaz · Town of Buena Vista · Village of Cazenovia · Town of Dayton · Town of Eagle · Town of Forest · Town of Henrietta · Town of Ithaca · Village of Lone Rock · Town of Marshall · Town of Orion · Town of Richland · Richland Center · Town of Richwood · Town of Rockbridge · Town of Sylvan · Town of Westford · Town of Willow · Village of Yuba

Answers from the rulebook for Richland County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Richland County rules

  • Building permitRequired

    New one- and two-family dwellings in Richland County.

    • In certain townships, additions to dwellings also require UDC building permits.
    • The local UDC inspector should be contacted.
    “Uniform Dwelling Code Building permits are required for all new one and two family dwellings and, in certain townships, additions to dwellings.”
    One more reviewed finding on this topic
    • Required — New one- and two-family dwellings in rural Richland County and additions in certain townships.
      “Uniform Dwelling Code Building permits are required for all new one and two family dwellings and, in certain townships, additions to dwellings.”
  • County-wide zoningPresent (with conditions)

    Richland County comprehensive zoning, shoreland, subdivision, and floodplain regulation.

    • County land-use permitting jurisdiction is specifically identified for participating townships and may differ in incorporated municipalities.
    “The mission of the Zoning Department is to regulate land uses within the county through the enforcement of comprehensive zoning, shoreland, subdivision and floodplain ordinances as well as related Wisconsin Administrative Codes to achieve those stated goals.”
  • Local zoningVaries (with conditions)

    Aggregate zoning authority across Richland County townships and incorporated municipalities.

    • Richland County issues land-use permits for Akan, Buena Vista, Dayton, Eagle, Forest, Henrietta, Marshall, Orion, Richland, Richwood, Westford, and Willow Townships.
    • Ithaca Township and Rockbridge Township have identified local contacts.
    • The county page separately identifies the City of Richland Center and villages of Boaz, Cazenovia, Lone Rock, Viola, and Yuba.
    “Questions regarding the following municipalities should be directed to:”
    One more reviewed finding on this topic
    • Varies (with conditions) — County aggregate of county-administered zoning and municipal or township-specific zoning within Richland County.
      “Land Use Permit – Richland County issues land use permits for Akan, Buena Vista, Dayton, Eagle, Forest, Henrietta, Marshall, Orion, Richland, Richwood, Westford, and Willow Townships.”
  • Minimum dwelling sizeDistrict specific (with conditions)

    Dwelling floor-area requirements in applicable Richland County zoning districts.

    • The county page states that floor area varies by zoning district.
    • Contact with the Zoning Office is required to determine the minimum square footage for the applicable district.
    “All cabins are considered dwellings. Floor area of a dwelling varies by the zoning district. Contact the Zoning Office to determine minimum square footage required.”
    One more reviewed finding on this topic
    • District specific (with conditions) — Dwellings and cabins subject to Richland County zoning districts.
      “All cabins are considered dwellings. Floor area of a dwelling varies by the zoning district. Contact the Zoning Office to determine minimum square footage required.”
  • Minimum lot sizeSpecified

    County-zoned mobile home parks in applicable unincorporated areas of Richland County.

    • A mobile home park requires county natural resources standing committee plan approval and a conditional use permit.
    • The minimum lot size for the mobile home park is five acres.
    • The maximum number of mobile home sites is six per acre.
    • Each mobile home site must be at least 50 feet wide by 100 feet long.
    • There must be at least 15 feet between mobile home trailers.
    • There must be at least 10 feet between a mobile home and the service road.
    • There is a minimum 40-foot setback from all other exterior lot lines, in addition to highway and high-water-mark setbacks.
    • Mobile home parks must comply with county sanitation regulations and applicable Wisconsin sanitary requirements.
    • No mobile home site may have an individual on-site soil absorption sewage disposal system.
    • No mobile home site may be rented for less than 30 days.

    minimum mobile home park lot size: >= 5 acres · maximum mobile home sites: per 6 per acre · minimum mobile home site dimensions: 50 x 100 feet

    “3. Minimum lot size shall be five acres. 4. Maximum number of mobile home sites shall be six per acre. 5. Minimum dimensions of a mobile home site shall be 50 feet wide by 100 feet long. [...] 12. No mobile home site shall be rented for a period of less than 30 days.”
  • SetbacksSpecified

    Structural setbacks in Richland County zoning districts.

    • Applicants identify anticipated uses and structural setbacks.
    • The applicable zoning district and local authority must be confirmed.
    “The uses of land are regulated through a permitting process whereby applicants identify anticipated uses and structural setbacks and our department ensures compliance with the applicable codes.”
  • Living in an RVTemporary only (with conditions)

    Trailers or camping units located at county-regulated trailer camps, campgrounds, and camping resorts.

    • The county natural resources standing committee must approve plans for trailer camps and campgrounds.
    • Each trailer or camp site must be plainly marked and surfaced.
    • Maximum number of trailer or camp sites is 15 per acre.
    • The minimum size of a travel trailer park or campground is three acres.
    • Each travel trailer or camp site must be at least 25 feet wide by 40 feet long.
    • Each site must be separated from other travel trailer sites by a yard not less than 15 feet wide.
    • There must be 1½ automobile parking spaces for each trailer or camp site.
    • There is a minimum setback of 40 feet from all other exterior lot lines, in addition to highway and high-water-mark setbacks.
    • Campgrounds must comply with Wis. Admin. Code ch. ATCP 79 to the extent applicable.
    • No trailer or camping unit may remain on one site for more than 30 days, or an extension not exceeding 60 days.

    maximum occupancy at one site: <= 30 days (extension not to exceed 60 days) · maximum trailer or camp sites: per 15 per acre · minimum campground size: >= 3 acres

    “No trailer or camping unit shall be located on one site for a period of more than 30 days or an extension thereof not to exceed 60 days.”
    One more reviewed finding on this topic
    • Limited — Camping units in public or private campgrounds located in Richland County floodplain areas.
      “The camping units shall not occupy any site in the campground for more than 180 consecutive days, at which time the camping unit must be removed from the floodplain for a minimum of 24 hours;”
  • Who permits septicCounty (with conditions)

    Private onsite wastewater and sanitary permits in Richland County.

    • The sanitary permit is submitted by a plumber and approved by the county.
    • A maintenance agreement must be registered on the deed.
    “Sanitary Permit ($550.00) (May require state plan) a. Submitted by Plumber b. Approved by County c. Maintenance Agreement, register on deed”
    One more reviewed finding on this topic
    • County (with conditions) — Private onsite wastewater treatment systems and non-plumbing sanitation systems in unincorporated Richland County and incorporated areas without their own sanitary code.
      “The Richland County Zoning Administrator (herein referred to as Administrator) shall be responsible for the administration of this ordinance.”
  • Septic permitRequired

    Sanitary permits for private onsite wastewater systems and non-plumbing sanitation systems.

    • A soil test is part of the county's listed pre-permit sequence.
    • The county page states that a sanitary permit may require a state plan.
    • For cabins without interior plumbing, a sanitary permit application is required for a non-plumbing sanitation system.

    sanitary permit fee: 550 USD (May require state plan)

    “If your cabin will not have interior plumbing a non-plumbing sanitation system will be required and a sanitary permit application must be completed and filed with the Zoning Department.”
    One more reviewed finding on this topic
    • Required — Private wastewater treatment systems and non-plumbing sanitation systems in the ordinance jurisdiction.
      “Every privately owned wastewater treatment system and non-plumbing sanitation system shall require a separate application and permit.”
  • Off-grid sanitationAllowed (with conditions)

    Non-plumbing sanitation systems for cabins without interior plumbing.

    • A sanitary permit application must be completed and filed with the Zoning Department.
    • The system must be within Wisconsin Administrative Code SPS 391 scope.
    • A notarized maintenance agreement must be recorded on the property deed and submitted with the sanitary permit application.
    • The system must be NSF approved.
    • A land-use permit may be obtained after sanitary-permit approval.

    land-use permit fee: >= 225 USD ($0.20 per square foot)

    “Any non-plumbing sanitation system must be National Sanitation Foundation (NSF) approved.”
    2 more reviewed findings on this topic
    • Allowed (with conditions) — Cabins or dwellings without interior plumbing using non-plumbing sanitation systems.
      “If your cabin will not have interior plumbing a non-plumbing sanitation system will be required and a sanitary permit application must be completed and filed with the Zoning Department.”
    • Limited — Structures without interior plumbing in the ordinance jurisdiction.
      “A non-plumbing sanitation system shall be installed when a structure with no interior plumbing is used for human habitation.”
  • Mandatory utility hookupConditional

    Water and wastewater service for structures in the ordinance jurisdiction.

    • All plumbing fixtures must connect to public sewer where available.
    • A private sewage system may be used when no public sewer is available.
    • If plumbing is installed in a structure, a private onsite wastewater treatment system must be installed before connection of water service.
    “All plumbing fixtures shall be connected to a public sewer where available.”
  • Subdividing landRegulated (with conditions)

    County, minor, and state subdivisions reviewed under Richland County land-division procedures.

    • County subdivisions must have direct access to public streets.
    • County subdivisions cannot be approved where private roads or easements are proposed to provide access.
    • State subdivisions require a preliminary plat conforming to Wisconsin Statutes section 236.11.
    • Preliminary plats generally receive action within 90 days and final plats within 60 days unless extended by mutual agreement.
    “All lots in county subdivisions shall have direct access to public streets. County subdivisions shall not be approved where private roads or easements are proposed to provide access.”
  • Driveway accessRequired

    Driveway and access approvals for properties using state, county, or town roads in Richland County.

    • The applicable road authority differs by road: Wisconsin Department of Transportation for state roads, County Highway Department for county roads, and the town chairman for town roads.
    • An access approval and driveway approval may both be required depending on the road.
    • Driveway permits must be obtained before the land-use permit can be issued.
    “Your property may require an access approval and a driveway approval depending on which road your access is on. Driveway permits must be obtained before land use permit can be issued.”
    One more reviewed finding on this topic
    • Required — A proposed driveway serving rural Richland County property when the road authority requires access approval.
      “Your property may require an access approval and a driveway approval depending on which road your access is on. Driveway permits must be obtained before land use permit can be issued.”
  • Permit processPublished (with conditions)

    New dwelling and related land-use permitting in Richland County.

    • The county sequence includes soil-test filing, sanitary permit, land-use permit, driveway or access approval if applicable, county address sign, and UDC building permit.
    • Driveway permits must be obtained before a land-use permit can be issued.
    • A land-use permit is not needed for listed maintenance work or a structure under 120 square feet without a foundation.
    “Obtaining the necessary permits takes time and planning; allow for this when you are considering a construction starting date as all necessary permits must be obtained prior to the start of construction.”
    One more reviewed finding on this topic
    • Published (with conditions) — New dwelling construction and other construction in rural Richland County.
      “Obtaining the necessary permits takes time and planning; allow for this when you are considering a construction starting date as all necessary permits must be obtained prior to the start of construction.”

Wisconsin rules that apply here

  • Owner-builder exemptionConditional

    An owner obtaining construction and erosion-control permits for a dwelling covered by the Wisconsin Uniform Dwelling Code.

    • The owner must occupy the home currently or will occupy it after completion.
    • The exemption permits the owner to take out the construction and erosion-control permits without the state-certified Dwelling Contractor and Dwelling Contractor Qualifier arrangement described for contractors.
    • The owner-occupancy statement must be checked on the permit application if the applicant does not possess Dwelling Contractor certification.
    • The source describes an owner-occupancy condition; it does not establish a general exemption for non-occupant owners.
    “The construction and erosion control permits must be taken out by a state-certified Dwelling Contractor, who also employs a state-certified Dwelling Contractor Qualifier, or by the owner who occupies the home currently or will after completion.”
    3 more reviewed findings on this topic
    • Available (with conditions) — Construction and erosion-control permits for UDC-covered dwellings in Wisconsin.
      “The construction and erosion control permits must be taken out by a state-certified Dwelling Contractor, who also employs a state-certified Dwelling Contractor Qualifier, or by the owner who occupies the home currently or will after completion.”
    • Available (with conditions) — An owner-occupant applying for a Wisconsin UDC erosion-control or construction permit for the dwelling the owner currently occupies or will occupy.
      “You will leave those areas blank. At Step 5, you will check the box above your electronic signature which states “I vouch that I am or will be an owner-occupant of this dwelling for which I am applying for an erosion control or construction permit without a Dwelling Contractor Certification and have read the cautionary statement regarding contractor responsibility on the reverse side of the last ply of this form.””
    • Available (with conditions) — An owner-occupant applying for Wisconsin UDC construction or erosion-control permits.
      “Only check this box if the permit is being issued to the property owner who will occupy the home upon completion of construction.”
  • Building code adoptedAdopted (with conditions)

    Public buildings, places of employment, and multifamily buildings subject to Wisconsin's commercial building code.

    • The Division of Industry Services reviews plans before construction for compliance with state statutes and building codes.
    • Local certified municipalities may provide plan review and inspection services for certain building types.
    • The Wisconsin Commercial Building Code adopted the 2021 ICC effective September 1, 2025; plans submitted November 1, 2025 or later must comply with the updated code.
    • Municipalities may have grandfathered fire detection, prevention, and suppression ordinances under 2013 Act 270.

    2021 ICC adoption date: September 1, 2025 (The deadline for building plan compliance was delayed.) · updated-code plan-submission deadline: November 1, 2025 (Plans submitted on or after this date must comply with the updated Commercial Building Code.)

    “2013 Act 270 establishes a uniform commercial building code in Wisconsin while allowing municipalities to grandfather fire detection, prevention, and suppression ordinances”
    6 more reviewed findings on this topic
    • Adopted — New one- and two-family dwellings in Wisconsin, including applicable dwellings in Richland County.
      “The Uniform Dwelling Code (UDC) is the statewide building code for one- and two-family dwellings built since June 1, 1980. [...] The UDC is enforced in all Wisconsin municipalities.”
    • Adopted (with conditions) — Wisconsin Uniform Dwelling Code for new one- and two-family dwelling units, including stick-built, modular, and manufactured home installations in Richland County.
      “The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code.”
    • Adopted (with conditions) — New one- and two-family dwellings, including manufactured home installations, in Wisconsin including Richland County.
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
    • Adopted (with conditions) — New one- and two-family dwellings in Wisconsin built since June 1, 1980.
      “The Uniform Dwelling Code (UDC) is the statewide building code for one- and two-family dwellings built since June 1, 1980.”
    • Adopted (with conditions) — New Wisconsin one- and two-family dwelling construction, including stick-built, modular, and manufactured home installations
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
    • Adopted — Wisconsin's Uniform Dwelling Code, chapters SPS 320-325, for new one- and two-family dwelling units, including stick-built, modular, and manufactured home installations.
      “SPS 320-325 Uniform Dwelling Code (UDC), construction standard for 1-2 family dwelling units, applies uniformly statewide”
  • InspectionsRequired

    Each phase of construction of a one- or two-family dwelling governed by the Wisconsin Uniform Dwelling Code.

    • Inspections are called for before each phase is covered up.
    • The local inspector’s instructions apply.
    • The inspector has two business days after the inspection request and the work being ready to inspect before the work may be covered.
    • Inspections check compliance with the code and may also check compliance with approved plans.
    • The UDC is enforced by municipal or county building inspection departments or the Wisconsin Division of Industry Services.

    inspection response period: 2 business days (After the inspection request and the work is ready to inspect, before the work may be covered up.)

    “Call for inspections of each phase of construction prior to covering it up - check the local inspector’s instructions. The inspector has two business days after the date that you make the inspection request and the work is ready to inspect, before you may cover up the work. Inspectors will check for compliance with the code.”
    4 more reviewed findings on this topic
    • Required — Construction of UDC-covered one- and two-family dwellings in Wisconsin.
      “Call for inspections of each phase of construction prior to covering it up - check the local inspector’s instructions. The inspector has two business days after the date that you make the inspection request and the work is ready to inspect, before you may cover up the work. Inspectors will check for compliance with the code.”
    • Required — UDC construction and inspection of new one- and two-family dwellings.
      “Except as provided in Wis. Stat. secs. 101.651 (1) and (2m), cities, villages, and towns shall exercise jurisdiction over the construction and inspection of new one- and two-family dwellings provided the municipality complies with DSPS requirements.”
    • Required — New one- and two-family dwellings subject to the Wisconsin UDC.
      “The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
    • Required — New one- and two-family dwellings subject to the Wisconsin Uniform Dwelling Code.
      “The following inspections are required on new one- and two-family dwellings.”
  • Certificate of occupancyLimited

    Occupancy of UDC-covered dwellings in Wisconsin.

    • Occupancy follows a final inspection in which no major health or safety violations are found.
    • Some municipalities issue occupancy permits; the state source does not say all municipalities do.
    • The dwelling exterior must be completed within two years after permit issuance.

    exterior completion deadline: 2 years after permit issuance

    “Take occupancy after receiving a final inspection in which no major health or safety violations are found. (Some municipalities will issue occupancy permits.) Also, the dwelling’s exterior must be completed within two years after permit issuance.”
    One more reviewed finding on this topic
    • Limited — Occupancy of a dwelling governed by Wisconsin’s Uniform Dwelling Code after construction.
      “Take occupancy after receiving a final inspection in which no major health or safety violations are found. (Some municipalities will issue occupancy permits.) Also, the dwelling’s exterior must be completed within two years after permit issuance.”
  • Zoning districtsPartial

    Statewide floodplain zoning guidance; the Wisconsin DNR publishes a model floodplain ordinance for communities but does not thereby establish every local zoning district.

    • The source describes a model ordinance that communities should use when amending, repealing, or recreating a floodplain ordinance.
    • The source does not provide a statewide inventory or complete publication of local zoning districts.
    • Local community adoption and local ordinance details remain necessary.
    “This is the model version that should be used by any community amending or repealing and recreating a floodplain ordinance.”
  • Lot coverageSpecified

    Impervious-surface coverage in the statewide shoreland framework and the DNR county model ordinance for qualifying shoreland lots or parcels.

    • The general standard applies to construction, reconstruction, expansion, replacement, or relocation of impervious surfaces within 300 feet of the ordinary high-water mark on riparian lots and parcels entirely within 300 feet of the ordinary high-water mark.
    • The general standard is 15 percent.
    • A lot or parcel may exceed 15 percent but not exceed 30 percent with a permit and mitigation plan.
    • For highly developed shorelines, counties are not required to adopt the special standards; if adopted, residential coverage may exceed 30 percent but not exceed 40 percent with a mitigation plan.
    • Treated impervious surfaces and defined roadways and sidewalks may be excluded from calculation when the ordinance conditions are met.

    general impervious-surface limit: <= 15 percent of lot or parcel · maximum under general standard with mitigation: 30 percent of lot or parcel (permit and mitigation plan required) · highly developed shoreline residential maximum: 40 percent of lot or parcel (special standard adopted and mitigation plan required)

    “The percentage of impervious surface allowed on a lot or parcel described under section 11.2 and as calculated under section 11.3 shall not exceed 15%.”
  • Building heightSpecified

    Structures within 75 feet of the ordinary high water mark of navigable waters in Wisconsin shoreland zoning areas.

    • The DNR model ordinance identifies this as the NR 115.05(1)(f) height standard for county shoreland ordinances.
    • The prohibition does not extend beyond 75 feet from the ordinary high water mark under the stated standard.
    • Counties may regulate height beyond 75 feet through local ordinance.

    maximum structure height within 75 feet of ordinary high water mark: <= 35 feet (A structure taller than 35 feet is prohibited within the specified area.)

    “A structure taller than 35 feet within 75 feet of the ordinary high-water mark of any navigable waters is prohibited”
  • Manufactured homesAllowed (with conditions)

    Occupancy of a manufactured home installed as a new one- or two-family dwelling in Wisconsin.

    • The Uniform Dwelling Code applies to new one- and two-family dwellings built since June 1, 1980.
    • The UDC includes manufactured homes and the installation of manufactured homes produced on or after April 1, 2007.
    • Occupancy follows a final inspection in which no major health or safety violations are found.
    • Some municipalities issue occupancy permits.
    • The dwelling exterior must be completed within two years after permit issuance.
    • Local sanitary requirements may require certain plumbing systems.
    • Local zoning and land-use requirements may also apply.

    UDC coverage start date: >= 1980-06-01 date (The cited coverage is for new one- and two-family dwellings and their additions and alterations.) · manufactured-home installation coverage start date: >= 2007-04-01 date · exterior completion deadline: <= 2 years after permit issuance

    “The installation of manufactured homes produced on or after April 1, 2007.”
    One more reviewed finding on this topic
  • Septic inspectionRequired

    Privately owned wastewater treatment systems and septic systems statewide in Wisconsin.

    • Systems must be visually inspected at least once every three years.
    • Anaerobic treatment tanks must be serviced when combined sludge and scum volume reaches one-third of tank volume.
    • Counties, acting as state agents, operate maintenance-tracking programs and send reminders to landowners.

    visual inspection interval: <= 3 years · combined sludge and scum service threshold: >= 33.333333 percent of tank volume (One-third of tank volume.)

    “The code only requires that systems shall be visually inspected at least once every 3 years.”
  • Well permitLimited

    Construction of private wells statewide in Wisconsin.

    • A Well Construction Notification Number must be obtained before constructing a new private well that is not a high-capacity well.
    • Exceptions to the notification requirement include high-capacity wells, reconstruction of existing wells, and wells on Native American property; high-capacity wells or other wells requiring written DNR approval follow the approval requirements.
    • Some DNR-approved county ordinances additionally require a well permit before construction.
    • A Well Construction Report must be submitted to DNR within 30 days after construction.

    well construction notification fee: 50.5 USD (Fee and notification number are not refundable or transferable.) · well construction report deadline: 30 days after construction

    “Wisconsin law requires that a property owner provide advance notice to DNR before construction of any new private well that is not a high capacity well, and advance notice of any heat exchange drillhole construction (geothermal system) that does not require a written DNR approval.”
  • Agricultural exemptionConditional

    Wisconsin farmland preservation zoning districts and farmland preservation agreements; these are conditional agricultural-use protections and tax-credit frameworks, not a blanket exemption from local land-use or land-division ordinances.

    • Certified farmland preservation zoning districts limit land uses to agriculture and other compatible uses.
    • Local ordinances are crafted locally and must meet or be more restrictive than Chapter 91 standards.
    • A farmland preservation agreement requires land to remain in agricultural use for 10 years and comply with state soil and water conservation standards.
    • Agreement eligibility requires ownership of the farmland, location in a designated Agricultural Enterprise Area, at least $6,000 gross farm revenue during the last year or $18,000 during the last three years, and compliance with applicable conservation standards.
    • A certificate of compliance from the county land conservation committee is required to show compliance.
    • Other local zoning and land-division ordinances continue to apply.
    • A covered agreement provides exemption from special assessments for sanitary sewer or water imposed by specified local governmental entities.
    • Releases before expiration require written consent, a DATCP finding that agricultural use of other protected farmland will not be impaired, and payment of the specified conversion fee.

    farmland preservation agreement term: 10 years (agreements effective before December 8, 2023, were minimum 15-year agreements) · minimum gross farm revenue during last year: >= 6000 USD (alternative test of $18,000 during the last three years) · minimum gross farm revenue during last three years: >= 18000 USD (alternative to the $6,000 last-year test) · tax credit: $10.00 per acre or $12.50 per acre if also in a certified farmland preservation zoning district (other eligibility requirements apply)

    “Remember that other local ordinances (such as zoning and land division ordinances) continue to apply to your land, regardless of whether you sign an agreement.”
  • Building in a floodplainLimited

    Development in Wisconsin floodplains, including floodway and floodfringe areas.

    • Floodplain development typically requires a land use permit and a building permit.
    • In the floodway, new structures, substantially improved or damaged structures, hazardous or solid-waste storage, and wells or sewage systems are prohibited.
    • Floodway development is limited to open-space uses with low flood-damage potential unless the stated analysis or FEMA map-revision condition is met.
    • Floodfringe structures must have the first floor elevated two feet above base flood elevation and have dryland access.
    • Substantially damaged structures are subject to the stated 50-percent threshold and applicable elevation or relocation requirements.

    floodfringe first-floor elevation: >= 2 feet above base flood elevation (for all new and substantially damaged or improved structures in the floodfringe)

    “In the floodway, new structures, substantially improved or damaged structures, the storage of hazardous/solid waste and wells/sewage systems are prohibited.”
    One more reviewed finding on this topic
    • Limited — Development within floodplain areas regulated by a Wisconsin community floodplain zoning ordinance based on the DNR model and state minimum standards.
      “A land use permit shall be obtained before any development; repair, modification, or addition to an existing structure; or change in the use of a building or structure, including sewer and water facilities, may be initiated.”
  • Short-term rentalsLimited

    Lodging rented to tourists or transients for short periods in Wisconsin, including homes, condos, cabins, cottages, and similar lodging facilities.

    • A DATCP lodging permit is required for all lodging facilities in Wisconsin.
    • A tourist or transient must be away from the person's permanent address.
    • The reviewed source does not establish local zoning or municipal operating restrictions.
    “If lodging is rented to a tourist or transient, it will require a permit.”
  • Permit feesPublished (with conditions)

    DNR construction-site stormwater permit coverage for construction projects disturbing one or more acres statewide.

    • Coverage applies to projects disturbing one acre or more through clearing, grading, excavating, or stockpiling fill.
    • The entire proposed project is counted, including phased common plans of development or sale.
    • Agricultural activities described in NR 216.42 may be exempt.
    • The applicable fee depends on acres of land disturbance.

    application fee for 1 to less than 2 acres: 250 USD (after January 1, 2023) · application fee for 2 to less than 5 acres: 350 USD (after January 1, 2023) · application fee for 5 to less than 25 acres: 550 USD (after January 1, 2023) · application fee for 25 or more acres: 800 USD (after January 1, 2023)

    “Acres of Land Disturbance | Application Fee Before Jan. 1, 2023 | Application Fee After Jan. 1, 2023 [...] At least 1 but less than 2 | $ 140 | $ 250 [...] 2 or more and less than 5 | $ 140 | $ 350 [...] 5 or more and less than 25 | $ 235 | $ 550 [...] 25 or greater | $ 350 | $ 800”
    2 more reviewed findings on this topic
    • Variable (with conditions) — Wisconsin Uniform Dwelling Code permit fees for new dwellings statewide.
      “The municipality shall, by ordinance, determine fees”
    • Published (with conditions) — DNR well construction notification for a new private well that is not a high capacity well.
      “The Well Construction Notification fee is $50.50. A Heat Exchange Notification has no fee. The fee and notification number are not refundable or transferable.”
  • Campground & park staysLimited

    Recreational trailers, pickup truck campers, and motor homes occupying campsites in Wisconsin State Park System family campgrounds.

    • Camping reservations are required before setting up on any site.
    • A campsite may contain no more than one recreation trailer, pickup truck camper, or motor home.
    • No person may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.
    • Pickup campers or motor homes pulling a trailer are treated as a single unit.

    maximum camping-unit occupancy per campsite: 1 recreation trailer, pickup truck camper, or motor home (Pickup campers or motor homes pulling a trailer are treated as a single unit.) · maximum stay: 14 days in any 21 days

    “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.”
    3 more reviewed findings on this topic
    • Limited — Occupancy of recreational vehicles, including recreation trailers, pickup truck campers, motor homes, camper vans, and truck campers, at Wisconsin State Park System campsites.
      “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit.”
    • Limited — Temporary camping at Wisconsin State Park System properties.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site.”
    • Limited — Temporary camping in Wisconsin State Park System family campgrounds.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days. [...] Not all properties offer camping during non-summer months. Camping seasons vary by property.”
  • county zoning authorityGeneral

    Wisconsin counties may enact and amend county zoning ordinances under Wis. Stat. § 59.69 for participating towns, which are generally unincorporated areas.

    • County zoning applies only in towns that have adopted county zoning.
    • After a comprehensive revision of the county zoning ordinance, the town has authority to decide whether county zoning applies in the town.
    • Towns have authority to approve or disapprove amendments to a county zoning ordinance.
    • A town that does not fall under county zoning may be unzoned or may have its own town zoning ordinance.
    “Counties exercise zoning ordinances under s. 59.69, Wis. Stats. County zoning only applies in towns that have adopted county zoning.”
  • county building authorityGeneral

    Wisconsin county authority to administer construction and inspection of new one- and two-family dwellings, including in unincorporated areas, through the UDC delegation and inspection framework.

    • Counties must have delegated authority to exercise UDC jurisdiction.
    • A county with delegated authority has jurisdiction over new one- and two-family dwellings in cities, villages, and towns that do not have their own delegated authority.
    • The DSPS page directs applicants to the municipality when it has delegated authority and otherwise to DSPS or the appointed county inspector.
    • The authority described is for construction and inspection under the statewide UDC; local zoning, land-use, sanitary, floodplain, and other requirements may still apply.

    covered construction: new one- and two-family dwellings (Jurisdiction depends on DSPS delegation and whether the municipality has its own delegated authority.)

    “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”
    2 more reviewed findings on this topic
    • General — County authority to enforce the statewide Uniform Dwelling Code and administer building inspection and permitting for new one- and two-family dwellings in Wisconsin, including unincorporated areas where the county is the responsible inspection authority.
      “The UDC is primarily enforced by municipal or county building inspectors who must be state-certified. In lieu of local enforcement, municipalities have the option to have the state provide enforcement for just new homes.”
    • Limited — County enforcement of Wisconsin’s Uniform Dwelling Code for new one- and two-family dwellings in municipalities, including towns, that do not have their own delegated authority
      “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”

Set by your township or city, not the county

In Wisconsin, zoning is adopted by each township or city, so Richland County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Camping on your land
  • Tiny homes
  • Accessory dwellings

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Richland County, Wisconsin

Is Richland County a good place to live off-grid or homestead?

Richland County scores 74/100 on the Bolthole Index, a strong county profile. Its strengths: a stronger property-autonomy legal backdrop and sparse surroundings — about 18,710 people within a 30-minute drive.

Do you need a building permit in Richland County, Wisconsin?

Richland County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Richland County Zoning & Sanitation Department. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Richland County, Wisconsin?

Land in Richland County runs about $4,770 per acre, based on the latest county data.

What is the water situation in Richland County?

Richland County gets about 37.1" of rain a year, with severe drought in roughly 7.3% of years.

How remote is Richland County?

A representative private-land location has about 18,710 people within a 30-minute drive and 1,407,715 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Richland compares in Wisconsin

Compare side-by-side →See all 72 Wisconsin counties ranked →