Price County, Wisconsin

Building permits, zoning and land rules in Price County, Wisconsin

75Index Score / 100
#16 of 72 in Wisconsin

Unincorporated Price County, Wisconsin requires two separate approvals for a new home: a county land-use permit from the Price County Zoning Department and a Wisconsin Uniform Dwelling Code building permit1. A sanitary (septic) permit must be issued first, and every sanitary permit in the county goes through the Zoning Department23. County zoning covers most unincorporated land, but five towns zone their own non-shoreland land4.

At a glance

Building permit
County land-use permit plus a separate UDC building permit for a new one- or two-family dwelling15
Zoning
County zoning applies broadly; five towns zone their own non-shoreland land4
Septic
Sanitary permit through the county Zoning Department, required before the new-dwelling land-use permit231
RV living
Limited on parcels subject to county zoning6
Floodplain
Floodplain development permit required in mapped flood-hazard areas7
Tiny home
No express tiny-home occupancy rule confirmed; ask the Zoning Department8
Owner-builder
An owner who occupies or will occupy the home may take out the UDC permit9
Private well
Advance state notification is generally required before construction10

Who to call

Zoning

Price County Zoning & Land Conservation

County zoning, land-use questions, sanitary permits and local permit coordination

715-339-3272

lcd@pricecounty.wi.gov

Price County Normal / Annex Building 104 S Eyder Ave Room 205 Phillips, WI 54555

Online permits →

Roads & driveways

Price County Highway Department

Driveway access to county highways

715-339-3081

Price County Highway Building 704 N Lake Ave Phillips, WI 54555

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in Price County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit or land-use permit in Price County, Wisconsin?

Yes, and for a new house it is two permits. Unincorporated Price County requires a land-use permit application and plot plan for a new dwelling, submitted with the property's 911 uniform number, a driveway access permit and the sanitary permit11; the sanitary permit must be obtained before the land-use permit can be released1. A separate Wisconsin Uniform Dwelling Code building permit is also required for new one- and two-family dwellings, including stick-built, modular and manufactured homes112. Construction starts only after the plans are approved and the permit is issued and posted13.

The county land-use permit fee for a new dwelling is $0.22 per square foot with a $100 minimum, and the county publishes separate lower fees for additions and accessory buildings14. A permit applied for after the work is done costs double the fee15. The county's building guide notes that township, state and federal permits may also be required16. Agricultural buildings have a county land-use-permit exemption only in the circumstances described by the county, and exempt structures still must meet dimensional and setback requirements17. That exemption does not cover every state, town, sanitary or access approval.

Who issues building permits and land-use permits in Price County, and how do you reach them?

Land-use permits and sanitary permits come from Price County Zoning & Land Conservation at the Normal / Annex Building in Phillips; the office also tells applicants which other approvals a project needs8. The county verifies setback distances when it reviews the plot plan18. Building permits are a different track: Wisconsin Uniform Dwelling Code applications go to the responsible municipality or its authorized inspection agency, and a certified UDC inspector reviews the submission19. Ask the Zoning Office to identify the UDC inspector for the parcel8.

In the five towns that zone their own non-shoreland land, the town sets zoning, but sanitary permits still go through the county Zoning Department34. Permit fees for the UDC building permit vary by enforcing municipality or inspection contract, while the statewide rules include a permit-seal charge for each new dwelling20. Inspections are required before covered phases are concealed, following the local inspector's instructions21. The required inspections on a new one- or two-family dwelling are footings, foundation and reinforcement, rough work, insulation and final, and the applicant notifies the inspector named on the UDC permit when each is ready22.

Does Price County have zoning?

Yes, but the parcel location matters. County zoning governs unincorporated Price County except non-shoreland land in the Towns of Kennan, Catawba, Georgetown, Ogema and Hill; buyers in those exceptions should contact the town chairman about local zoning423. Shoreland zoning separately reaches land within 1,000 feet of a lake or flowage and within 300 feet of a river, creek or stream4.

Price County publishes zoning districts (RR-1, RF-1, A-1, CI-1 and C-1) with district-specific setbacks24. The county's principal-building setback is 10 feet in RR-1, RF-1 and C-1, 20 feet in A-1 and 15 feet in CI-1, and accessory buildings need 5 feet in most of those districts and 10 feet in A-125. Lots subject to county rules need 20,000 square feet and 100 feet of frontage when they abut water, 10,000 square feet in a sanitary district and 1 acre otherwise26. Newly created lots also need 40 feet of public-road frontage or a recorded 66-foot-wide easement26. We could not confirm a countywide minimum dwelling size; the one size rule we found is in RR-1, where a HUD-code mobile home over 320 square feet counts as the equivalent of a one-family dwelling27. Ask the Zoning Department about the specific district and design8.

How do septic permits work in Price County?

Septic permits are a county function everywhere in Price County, including the five towns that zone themselves: apply for the sanitary permit through the Price County Zoning Department3. A sanitary permit is required before issuance of any new dwelling permit2. The county describes a state sanitary permit or a qualifying privy permit as the available paths for meeting a new dwelling's sanitary requirement2. For a dwelling without pressurized water, Price County allows a privy under conditions: an open-pit privy requires a soil boring and agreement, while a vaulted privy still requires the agreement and is the only privy type identified for shoreland areas28.

Site conditions deserve early attention because the soil dataset rates 0% of county soils as free of severe limits for a conventional drain field29. That screening statistic does not decide an individual site, but it makes a soil evaluation especially important before purchase. Wisconsin also requires private wastewater systems to receive a visual inspection at least once every 3 years30.

Can you live in an RV or tiny home in Price County?

On parcels subject to Price County zoning, an RV may stay on a parcel for up to 4 months in a calendar year without a permit only when the site has a 911 number and sanitary system; a longer stay requires a land-use permit for a new dwelling.6 The county treats a mobile home under 32 feet as an RV for this rule.6

A mobile home longer than 32 feet needs land-use and sanitary permits to qualify as habitable, and older mobile homes face an additional restriction in Recreational-Residential districts.31 We could not confirm an express tiny-home occupancy rule or a general minimum home size. Ask Price County Zoning & Land Conservation how the proposed structure, foundation, utilities and parcel district affect its classification before buying or placing it.8 In one of the five non-shoreland town exceptions, also ask the town chairman about local zoning.4

Building a home in Price County: what are the steps?

  1. Confirm the parcel's zoning district, shoreland status, floodplain status and required setbacks with Price County Zoning & Land Conservation, and find out whether the parcel sits in one of the five towns that zone their own non-shoreland land84.
  2. Confirm legal access. A town-road driveway goes through the town, a county-highway driveway goes through the Price County Highway Department, and a state-highway connection needs WisDOT approval.3233
  3. Complete the soil work and obtain the sanitary permit from the Price County Zoning Department; it must come before the county land-use permit and the new-dwelling permit321.
  4. Obtain advance Wisconsin DNR notification before constructing a typical new private well.10
  5. Submit the county land-use permit application and plot plan to the Zoning Department, then the UDC building permit application, plans and fees to the responsible inspection authority119.
  6. Begin only after approval and permit posting, then call for inspections before covering each construction phase.1321

What should you check before buying land in Price County?

Start with the zoning map, parcel district and water proximity because shoreland coverage and the five town exceptions can change who answers the land-use question.4 Verify the lot meets the applicable area, frontage and access rules before treating it as buildable.26 If you plan to divide the land, a county land division carries its own fees and review, and a new lot cannot be longer than four times its width unless the Land Use and UW Extension Committee waives the ratio3435. For county-highway frontage, contact the Highway Department about driveway placement; state-highway access instead requires a WisDOT connection permit.3633

Order septic feasibility work early: the countywide soil screening shows severe conventional-drain-field limitations across the mapped soils, while the permit decision remains site-specific.29 Check mapped floodplain conditions: Price County's floodplain ordinance requires a floodplain development permit in mapped flood-hazard areas, and failing to obtain one is a violation7. Wisconsin also limits development in floodways and imposes elevation and access conditions in floodfringe areas37. Budget property carrying costs using the county's 1.4% effective property-tax rate and $2,110 median annual tax bill as broad benchmarks, not a parcel quote.3839

Watch-outs

  • A new house needs a county land-use permit and a separate Uniform Dwelling Code building permit, and the sanitary permit must be issued before the land-use permit1.
  • County zoning does not govern non-shoreland areas in five named towns, so contact the town chairman there; sanitary permits still go through the county Zoning Department43.
  • RV occupancy without a land-use permit is time-limited and still requires a 911 number and sanitary system on parcels subject to county zoning6.

Sources

  1. Price County Building Requirements, quoted and re-checked
  2. Septic Systems, quoted and re-checked
  3. Zoning & Land Conservation, quoted and re-checked
  4. Zoning & Land Conservation, quoted and re-checked
  5. Price County Building Requirements (2026 county census)
  6. Price County Building Requirements, quoted and re-checked
  7. Price County Floodplain Zoning Ordinance, quoted and re-checked
  8. Price County Zoning & Land Conservation (co.price.wi.us)
  9. Wisconsin DSPS - Building a Home in Wisconsin (UDC Guide) (2026 county census)
  10. Well and heat exchange notification (Wisconsin statewide rule), quoted and re-checked
  11. Price County Building Requirements, quoted and re-checked
  12. UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
  13. Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
  14. Price County Building Requirements, quoted and re-checked
  15. Price County Zoning Administration 2025 Fee Schedule, quoted and re-checked
  16. Price County Building Requirements, quoted and re-checked
  17. Price County Building Requirements, quoted and re-checked
  18. Price County Zoning Administration 2025 Fee Schedule, quoted and re-checked
  19. Wisconsin Administrative Code SPS 320.09 (Wisconsin statewide rule), quoted and re-checked
  20. Wisconsin Administrative Code SPS 302.34 (Wisconsin statewide rule), quoted and re-checked
  21. Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
  22. UDC Inspection Requirements, quoted and re-checked
  23. Zoning & Land Conservation, quoted and re-checked
  24. Price County Building Requirements, quoted and re-checked
  25. Price County Building Requirements, quoted and re-checked
  26. Price County Building Requirements, quoted and re-checked
  27. Article VI: Zoning Districts - Price County, WI, quoted and re-checked
  28. co.price.wi.us, quoted and re-checked
  29. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  30. Wisconsin Maintenance Program (Wisconsin statewide rule), quoted and re-checked
  31. Price County Building Requirements, quoted and re-checked
  32. Price County Building Requirements, quoted and re-checked
  33. State highway connection permits (driveways & more) (Wisconsin statewide rule), quoted and re-checked
  34. Price County Board Packet, August 19, 2025, quoted and re-checked
  35. Price County Zoning Administration 2025 Fee Schedule, quoted and re-checked
  36. Price County Highway Department (co.price.wi.us)
  37. Floodplain Development Basics (Wisconsin statewide rule), quoted and re-checked
  38. Effective property tax rate: Bolthole Index county data
  39. Median property tax bill: Bolthole Index county data

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Price County requires a building permit for a home.

RulePrice CountyIron CountySawyer CountyTaylor CountyOneida CountyRusk CountyLincoln County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesNoYesYesYes
Septic permitsCounty Zoning Dept.County Zoning Dept.County Zoning OfficeCounty Zoning Dept.County Planning & Zoning Dept.County Zoning OfficeCounty Land Services

County locator

Price County in Wisconsin

75
County map
Price County highlighted among the Wisconsin counties · colored by Index score

How Price County scores

Seclusion86100% ev.
Self-Sufficiency53100% ev.
Admin Boringness44100% ev.
Durability66100% ev.
Property Autonomy70100% ev.
Carry Cost75100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$213kTypical home
1.4%Property tax
$3,063Land / acre
33.1"Annual rain
5% of yrsSevere drought
0.2 / yr (+0.2)Mid-century 100°F days
12 daysMid-century dry spell
1.61" (+11.3%)Mid-century 1-day rain
1.66×Wildfire change factor
100%Forward climate coverage
$1,048Home insurance / yr
1.6% / yrInsurance growth
0.53%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
7,285People within 30 min
315,340People within 2 hr
7,022Radius comparison (15 mi)
11.2People / sq mi
18.8%Federal land
94.9%Land at 15% slope or less
0%Soils rated "not limited" for septic (strict USDA rating)
0 acWorkable land screen
83.7%Wooded land
29.3 tonsBiomass / forest ac
40.7°FAvg temp

Scout Price County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Price County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Price County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Town of Catawba · Village of Catawba · Town of Eisenstein · Town of Elk · Town of Emery · Town of Fifield · Town of Flambeau · Town of Georgetown · Town of Hackett · Town of Harmony · Town of Hill · Town of Kennan · Village of Kennan · Town of Knox · Town of Lake · Town of Ogema · Phillips · Town of Prentice · Village of Prentice · Town of Spirit · Town of Worcester

Answers from the rulebook for Price County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Price County rules

  • Building permitRequired

    New dwellings subject to Price County land-use administration in unincorporated Price County.

    • A Land Use Permit Application and plot plan are required for a new dwelling.
    • The sanitary permit must be obtained before a land use permit can be released.
    • The five listed non-shoreland town areas are exceptions to county zoning administration; local township requirements may apply there.
    • A separate Wisconsin UDC building permit is required for new one- and two-family dwellings.
    “New Dwelling (all of the following must be submitted) 1) Land Use Permit Application”
    One more reviewed finding on this topic
    • Required — New dwellings and listed construction projects subject to Price County land-use permitting.
      “The following list of projects is in an outline form to show what permits are required to be obtained before the project may begin.”
  • County-wide zoningPresent (with conditions)

    County shoreland areas and unincorporated areas subject to county zoning regulations.

    • All property within 1,000 feet of a lake or flowage and within 300 feet of a river, creek or stream is governed by the Price County Shoreland Ordinance.
    • County zoning does not apply to non-shoreland areas in the Towns of Kennan, Catawba, Georgetown, Ogema and Hill.
    • The county page states that all 17 townships adopted the Comprehensive Zoning Ordinance.

    lake or flowage setback jurisdiction: <= 1000 feet · river, creek, or stream setback jurisdiction: <= 300 feet

    “All unincorporated areas of Price County except for the non-shoreland areas located in the Towns of Kennan, Catawba, Georgetown, Ogema and Hill are governed by county zoning regulations.”
    One more reviewed finding on this topic
    • Present (with conditions) — County zoning in unincorporated Price County, subject to the stated town exceptions and separate shoreland coverage.
      “All unincorporated areas of Price County except for the non-shoreland areas located in the Towns of Kennan, Catawba, Georgetown, Ogema and Hill are governed by county zoning regulations.”
  • Local zoningVaries (with conditions)

    Local zoning across Price County, aggregating county zoning, shoreland zoning, and township-administered zoning.

    • County zoning governs all unincorporated areas except the non-shoreland areas of the Towns of Kennan, Catawba, Georgetown, Ogema, and Hill.
    • The county directs applicants in those listed non-shoreland town areas to contact the Town Chairman for zoning information.
    • The Price County Shoreland Ordinance applies within 1,000 feet of a lake or flowage and within 300 feet of a river, creek, or stream.
    • All 17 townships have adopted the Comprehensive Zoning Ordinance; the county aggregate does not mean the county administers each township ordinance.

    shoreland lake or flowage distance: <= 1000 feet · shoreland river, creek, or stream distance: <= 300 feet

    “All unincorporated areas of Price County except for the non-shoreland areas located in the Towns of Kennan, Catawba, Georgetown, Ogema and Hill are governed by county zoning regulations. Please contact your Town Chairman for zoning information in these townships.”
    One more reviewed finding on this topic
    • Varies (with conditions) — Aggregate of county, township, and municipal zoning in Price County.
      “In addition, all 17 of the Townships have adopted the Comprehensive Zoning Ordinance.”
  • Zoning districtsPublished (with conditions)

    Price County zoning districts identified in official county materials.

    • The county building guide identifies RR-1 Recreational-Residential, RF-1 Residential-Forestry, A-1 Agricultural, CI-1 Commercial-Industrial, and C-1 Conservancy districts.
    • The county’s zoning page states that some non-shoreland township areas are exceptions to county zoning.
    “This property is zoned as (found on tax bill): RR-1 RF-1 CI-1 C-1 A-1 Township Zoned (Circleone)”
    One more reviewed finding on this topic
    • Published — Price County zoning districts identified in the official building requirements guide.
      “HORIZONTAL SETBACKS OF ZONING DISTRICTS (RR-1) (RF-1) (A-1) (CI-1) (C-1)”
  • Minimum dwelling sizeDistrict specific (with conditions)

    Mobile homes used as the equivalent of a one-family dwelling unit in Price County's Recreational-Residential District (RR-1).

    • Applies specifically in the RR-1 district.
    • The rule addresses mobile homes and their treatment as equivalent to a one-family dwelling unit; it does not state a general minimum floor area for every dwelling type.
    • The mobile home must meet the Housing and Urban Development (HUD) Code.
    • A HUD seal must be affixed to certify that the unit is a manufactured home under the cited federal provisions.
    • The cited HUD standards include general construction rules, fire safety, testing, thermal protection, plumbing, electrical, heating and cooling, and transportation.

    mobile-home floor area: > 320 square feet (The cited threshold is for a mobile home to be considered the equivalent of a one-family dwelling unit in RR-1; the provision does not establish a general minimum dwelling floor area.)

    “One- and two-family dwelling units. Mobile homes over 320 square feet that meet the Housing and Urban Development (HUD) Code shall be considered the equivalent of a one-family dwelling unit in this district. Those units meeting the HUD Code will have a HUD seal affixed to the structure certifying that it is a manufactured home defined under 42 U.S.C. §§ 5401 to 5426.”
  • Minimum lot sizeSpecified

    Lots subject to Price County land-use and zoning requirements.

    • Waterfront lots require 20,000 square feet and 100 feet of frontage.
    • Lots in sanitary districts require at least 10,000 square feet.
    • Other lots require at least one acre.
    • Created lots require 40 feet of public-road frontage or a recorded 66-foot-wide easement.

    waterfront minimum lot area: >= 20000 square feet · sanitary-district minimum lot area: >= 10000 square feet · other minimum lot area: >= 1 acre · minimum public-road frontage: >= 40 feet (A recorded 66-foot-wide easement may satisfy access instead.)

    “MINIMUM LOT SIZES All lots abutting water shall be 20,000 square feet in area and shall have 100 feet of frontage. All lots in Sanitary Districts shall have a minimum of 10,000 square feet in area. All other lots shall be 1 acre in size.”
    One more reviewed finding on this topic
    • Specified — Lots subject to Price County zoning and land-division rules.
      “All lots abutting water shall be 20,000 square feet in area and shall have 100 feet of frontage. All lots in Sanitary Districts shall have a minimum of 10,000 square feet in area. All other lots shall be 1 acre in size.”
  • SetbacksSpecified

    Principal, accessory, barn, and stable structures in the listed Price County zoning districts, plus sanitary systems.

    • The listed dimensional table applies to the RR-1, RF-1, A-1, CI-1, and C-1 districts shown in the county building guide.
    • The county zoning department verifies setback distances.
    • Separate sanitary-system setbacks apply.

    principal building setback RR-1: 10 feet · principal building setback RF-1: 10 feet · principal building setback A-1: 20 feet · principal building setback CI-1: 15 feet · principal building setback C-1: 10 feet · accessory building setback RR-1/RF-1: 5 feet · accessory building setback A-1: 10 feet · accessory building setback CI-1/C-1: 5 feet

    “HORIZONTAL SETBACKS OF ZONING DISTRICTS [...] Principal Building 10 ft. 10 ft. 20 ft. 15 ft. 10 ft. [...] Accessory Building 5 ft. 5 ft. 10 ft. 5 ft. 5 ft.”
  • Living in an RVLimited

    Recreational-vehicle or qualifying mobile-home occupancy on a parcel in Price County.

    • A mobile home less than 32 feet long is treated as a recreational vehicle.
    • RV occupancy without a permit is limited to four months in a calendar year.
    • The parcel must have a 911 number and sanitary system.
    • Occupancy beyond four months requires a land-use permit for a new dwelling.

    maximum no-permit RV occupancy: <= 4 months per calendar year · mobile-home length threshold: < 32 feet

    “RV’s may be kept on a parcel for up to four months in a calendar year without a permit. The site must have a 911 number and sanitary system. If the RV is on a parcel for more than four months, a land use permit for a new dwelling must be obtained.”
    One more reviewed finding on this topic
    • Limited — Recreational vehicles and mobile homes on parcels subject to Price County zoning.
      “RV’s may be kept on a parcel for up to four months in a calendar year without a permit. The site must have a 911 number and sanitary system. If the RV is on a parcel for more than four months, a land use permit for a new dwelling must be obtained.”
  • Manufactured homesLimited

    Manufactured or mobile-home occupancy in Price County zoning districts.

    • A mobile home longer than 32 feet requires a land-use permit and sanitary permit to be considered habitable.
    • In Recreational-Residential Zoning Districts, mobile homes older than 1976 are not allowed.
    • Mobile homes shorter than 32 feet are treated as recreational vehicles and may remain without a permit for up to four months per calendar year subject to 911 and sanitary-system conditions.

    mobile-home length threshold: > 32 feet · older mobile-home cutoff: < 1976 year (Recreational-Residential Zoning Districts)

    “A mobile home longer than 32 feet must have a land use permit and a sanitary permit to be considered a habitable structure. In Recreational-Residential Zoning Districts, mobile homes older than 1976 are not allowed.”
    One more reviewed finding on this topic
    • Limited — Mobile/manufactured-home occupancy in Price County zoning districts.
      “A mobile home longer than 32 feet must have a land use permit and a sanitary permit to be considered a habitable structure. In Recreational-Residential Zoning Districts, mobile homes older than 1976 are not allowed.”
  • Who permits septicMixed (with conditions)

    Private onsite wastewater permitting in Price County.

    • Applications are routed through Price County Zoning.
    • The sanitary permit application uses the Wisconsin State Sanitary Permit application.
    • Licensed plumbers and certified soil testers perform specified technical work.
    “All sanitary permits must be applied for through the Price County Zoning Department.”
    One more reviewed finding on this topic
    • County — Sanitary permit routing and county administration in Price County.
      “All sanitary permits must be applied for through the Price County Zoning Department.”
  • Septic permitRequired

    New dwellings and private onsite wastewater systems in Price County.

    • A sanitary permit is required before issuance of a new dwelling permit.
    • For dwellings without pressurized water, a privy may be installed instead of a septic system.
    • Different application materials apply to conventional, mound, at-grade, holding-tank, reconnect, repair, renewal, and revision permits.
    “A sanitary permit is required prior to issuance of any new dwelling permit. Dwellings with no pressurized water may install a privy (outhouse).”
    One more reviewed finding on this topic
    • Required — New dwelling sanitary systems in Price County.
      “A sanitary permit is required prior to issuance of any new dwelling permit.”
  • Septic inspectionLimited

    Existing septic systems involved in reconnects, replacements, or certain older systems.

    • A septic tank inspection is required for the county’s reconnect process.
    • Systems older than 1990 may require a soil boring when no soil test is on record.
    • A POWTS inspector, POWTS maintainer, licensed plumber, or septic hauler may perform the tank inspection described in the county building guide.

    older-system threshold: < 1990 year (County guide states many systems older than 1990 require a soil boring.)

    “Reconnect Permit [...] Price County Existing POWTS Inspection form [...] Tank Replacement Permit [...] Price County Existing POWTS Inspection form”
    One more reviewed finding on this topic
    • Limited — Dwelling additions that modify wastewater flow, including bedroom additions.
      “Septic System Inspection (one or both of the following may need to be performed)”
  • Off-grid sanitationAllowed (with conditions)

    Dwellings without pressurized water using a privy or outhouse.

    • A sanitary or privy permit is required as applicable.
    • The building guide states that in shoreland areas only a vaulted privy can be utilized.
    • The guide identifies an open-pit privy soil-boring requirement and a required Privy Installation Agreement; a vaulted privy does not require a soil test but still requires the agreement.
    “Dwellings with no pressurized water may install a privy (outhouse).”
    One more reviewed finding on this topic
    • Allowed (with conditions) — Dwellings without pressurized water in Price County.
      “Dwellings with no pressurized water may install a privy (outhouse).”
  • Agricultural exemptionAvailable (with conditions)

    Specified farm buildings under Price County land-use permitting.

    • The exemption is from the Price County land-use permit requirement.
    • The structures must meet ordinance dimensional and setback requirements.
    “nor is a Land Use Permit required for farm buildings, school bus stop shelters, temporary shelters for horses, equipment for humans at a logging or pulpwood cutting operation or handicap ramps used exclusively to enter and exit a dwelling provided such structures meet the dimensional and setback requirements of the ordinances.”
  • Subdividing landRegulated (with conditions)

    County land divisions and plats in Price County.

    • The county publishes land-division permit categories and separate fees for first lots, additional lots, preliminary county plats, and final county plats.
    • The opened materials did not establish every substantive approval standard.

    first lot fee: 100 USD · each additional lot fee: 20 USD · preliminary county plat fee: 250 USD (plus review fees) · final county plat fee: per 50 USD (plus review fees)

    “III. LAND DIVISIONS: 1. First Lot [...] $100.00 2. Each Additional Lot [...] $20.00 3. Preliminary County Plat [...] $250.00 Plus Review Fees”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Land divisions and subdivisions governed by Price County requirements.
      “The length of any lot or parcel shall not exceed four times the width of that lot or parcel, unless waived by an affirmative vote by a majority of members of the Land Use and UW Extension Committee.”
  • Driveway accessRequired

    New driveway access associated with development in Price County.

    • For a town road, the town chairman signs the driveway access permit.
    • For a county highway, contact the Price County Highway Department.
    • For a state highway, contact Wisconsin DOT.
    • The general town permit states that no driveway-access construction may begin before a town permit is obtained.

    minimum driveway width: >= 16 feet · minimum overhead clearance: >= 14 feet (Emergency-vehicle access)

    “No work on the construction of a driveway access shall begin before a permit is obtained from the Town Board. The driveway must be at least 16 feet wide, with at least a 14 foot overhead clearance, allowing accessibility by emergency vehicles.”
    One more reviewed finding on this topic
    • Required — New dwelling and new driveway access in Price County.
      “The type of driveway access permit required depends upon what type of road your driveway connects to.”
  • Building in a floodplainLimited

    Structures and development subject to the Price County floodplain zoning ordinance.

    • Required permits, lowest-floor elevation documentation, floodproofing certificates, and required floodway encroachment calculations must be provided.
    • The cited ordinance defines missing documentation as presumed noncompliance until supplied.
    “A structure or other development without required permits, lowest floor elevation documentation, floodproofing certificates or required floodway encroachment calculations is presumed to be in violation until such time as that documentation is provided.”
    One more reviewed finding on this topic
    • Required — Development in Price County special flood-hazard areas identified by the ordinance and official maps.
      “All permits issued under the authority of this ordinance shall expire no more than 180 days after issuance.”
  • Permit feesPublished

    Published Price County land-use, sanitary, privy, conditional-use and variance fees.

    • The building guide publishes fees but does not state a fee-schedule effective date.

    new dwelling land-use permit: per 0.22 USD per square foot ($100 minimum) · addition land-use permit: per 0.15 USD per square foot ($50 minimum) · accessory building land-use permit: per 0.1 USD per square foot ($50 minimum) · privy permit: 100 USD · conditional use or special exception permit: 350 USD · board of adjustment variance: 750 USD · zoning amendment petition: 400 USD

    “New Dwelling $0.22/sq. ft. $100.00 Minimum”
    One more reviewed finding on this topic
    • Published — Price County zoning, land-use, sanitary, land-division, and related permit fees.
      “2025 Fee Schedule All Price County Zoning Fees are established by the Price County Board of Supervisors. I. LAND USE PERMIT: 1. New Home or Mobile Home: [...] $0.22/sq. ft. [...] $100.00 Minimum”
  • Permit processPublished (with conditions)

    County land-use and sanitary permit process in Price County.

    • Applicants complete county forms and plot plans, stake proposed structures, and may need township, state, federal, or DNR permits.
    • The county zoning department verifies setbacks and posts the permit if requirements are satisfied.
    • Incomplete or incorrect applications may be returned.
    “a. Fill out county application form and include a plot plan on the reverse side. b. Stake out proposed area for new home, mobile home, addition, or accessory building. c. The Zoning Department will verify the setback distances. d. If all is in order your permit will be posted.”
    One more reviewed finding on this topic
    • Published — County-published process for new dwellings, land-use permits, sanitary permits, driveway access, conditional uses and land divisions.
      “New Dwelling (all of the following must be submitted)”

Wisconsin rules that apply here

  • Owner-builder exemptionConditional

    An owner obtaining construction and erosion-control permits for a dwelling covered by the Wisconsin Uniform Dwelling Code.

    • The owner must occupy the home currently or will occupy it after completion.
    • The exemption permits the owner to take out the construction and erosion-control permits without the state-certified Dwelling Contractor and Dwelling Contractor Qualifier arrangement described for contractors.
    • The owner-occupancy statement must be checked on the permit application if the applicant does not possess Dwelling Contractor certification.
    • The source describes an owner-occupancy condition; it does not establish a general exemption for non-occupant owners.
    “The construction and erosion control permits must be taken out by a state-certified Dwelling Contractor, who also employs a state-certified Dwelling Contractor Qualifier, or by the owner who occupies the home currently or will after completion.”
    One more reviewed finding on this topic
    • Available (with conditions) — An owner-occupant applying for an erosion-control or construction permit for a one- or two-family dwelling.
      “You will leave those areas blank. At Step 5, you will check the box above your electronic signature which states “I vouch that I am or will be an owner-occupant of this dwelling for which I am applying for an erosion control or construction permit without a Dwelling Contractor Certification and have read the cautionary statement regarding contractor responsibility on the reverse side of the last ply of this form.””
  • Building code adoptedAdopted (with conditions)

    Public buildings, places of employment, and multifamily buildings subject to Wisconsin's commercial building code.

    • The Division of Industry Services reviews plans before construction for compliance with state statutes and building codes.
    • Local certified municipalities may provide plan review and inspection services for certain building types.
    • The Wisconsin Commercial Building Code adopted the 2021 ICC effective September 1, 2025; plans submitted November 1, 2025 or later must comply with the updated code.
    • Municipalities may have grandfathered fire detection, prevention, and suppression ordinances under 2013 Act 270.

    2021 ICC adoption date: September 1, 2025 (The deadline for building plan compliance was delayed.) · updated-code plan-submission deadline: November 1, 2025 (Plans submitted on or after this date must comply with the updated Commercial Building Code.)

    “2013 Act 270 establishes a uniform commercial building code in Wisconsin while allowing municipalities to grandfather fire detection, prevention, and suppression ordinances”
    5 more reviewed findings on this topic
    • Adopted (with conditions) — One- and two-family dwellings in Wisconsin, including Price County.
      “The Uniform Dwelling Code (UDC) is the statewide building code for one- and two-family dwellings built since June 1, 1980.”
    • Adopted (with conditions) — New one- and two-family dwelling units in Wisconsin, including manufactured homes, with local administration where delegated.
      “The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code. Enforces construction standards and inspection procedures including evaluation of building materials.”
    • Adopted (with conditions) — New one- and two-family dwellings in Wisconsin built since June 1, 1980.
      “The Uniform Dwelling Code (UDC) is the statewide building code for one- and two-family dwellings built since June 1, 1980.”
    • Adopted (with conditions) — New Wisconsin one- and two-family dwelling construction, including stick-built, modular, and manufactured home installations
      “A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
    • Adopted — Wisconsin's Uniform Dwelling Code, chapters SPS 320-325, for new one- and two-family dwelling units, including stick-built, modular, and manufactured home installations.
      “SPS 320-325 Uniform Dwelling Code (UDC), construction standard for 1-2 family dwelling units, applies uniformly statewide”
  • InspectionsRequired

    Each phase of construction of a one- or two-family dwelling governed by the Wisconsin Uniform Dwelling Code.

    • Inspections are called for before each phase is covered up.
    • The local inspector’s instructions apply.
    • The inspector has two business days after the inspection request and the work being ready to inspect before the work may be covered.
    • Inspections check compliance with the code and may also check compliance with approved plans.
    • The UDC is enforced by municipal or county building inspection departments or the Wisconsin Division of Industry Services.

    inspection response period: 2 business days (After the inspection request and the work is ready to inspect, before the work may be covered up.)

    “Call for inspections of each phase of construction prior to covering it up - check the local inspector’s instructions. The inspector has two business days after the date that you make the inspection request and the work is ready to inspect, before you may cover up the work. Inspectors will check for compliance with the code.”
    2 more reviewed findings on this topic
    • Required — New one- and two-family dwelling units in Wisconsin, including projects in Price County, with inspection performed by the authorized municipality, county, or DSPS-appointed inspector.
      “The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
    • Required — New one- and two-family dwellings in Price County subject to the Wisconsin UDC.
      “The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
  • Certificate of occupancyLimited

    Occupancy of a dwelling governed by Wisconsin’s Uniform Dwelling Code after construction.

    • Occupancy follows a final inspection in which no major health or safety violations are found.
    • Some municipalities will issue occupancy permits; the state source does not state that every municipality must issue a certificate or occupancy permit.
    • The dwelling exterior must be completed within two years after permit issuance.

    exterior completion deadline: 2 years after permit issuance

    “Take occupancy after receiving a final inspection in which no major health or safety violations are found. (Some municipalities will issue occupancy permits.) Also, the dwelling’s exterior must be completed within two years after permit issuance.”
  • Lot coverageSpecified

    Impervious-surface coverage in the statewide shoreland framework and the DNR county model ordinance for qualifying shoreland lots or parcels.

    • The general standard applies to construction, reconstruction, expansion, replacement, or relocation of impervious surfaces within 300 feet of the ordinary high-water mark on riparian lots and parcels entirely within 300 feet of the ordinary high-water mark.
    • The general standard is 15 percent.
    • A lot or parcel may exceed 15 percent but not exceed 30 percent with a permit and mitigation plan.
    • For highly developed shorelines, counties are not required to adopt the special standards; if adopted, residential coverage may exceed 30 percent but not exceed 40 percent with a mitigation plan.
    • Treated impervious surfaces and defined roadways and sidewalks may be excluded from calculation when the ordinance conditions are met.

    general impervious-surface limit: <= 15 percent of lot or parcel · maximum under general standard with mitigation: 30 percent of lot or parcel (permit and mitigation plan required) · highly developed shoreline residential maximum: 40 percent of lot or parcel (special standard adopted and mitigation plan required)

    “The percentage of impervious surface allowed on a lot or parcel described under section 11.2 and as calculated under section 11.3 shall not exceed 15%.”
  • Building heightSpecified

    Structures within 75 feet of the ordinary high water mark of navigable waters in Wisconsin shoreland zoning areas.

    • The DNR model ordinance identifies this as the NR 115.05(1)(f) height standard for county shoreland ordinances.
    • The prohibition does not extend beyond 75 feet from the ordinary high water mark under the stated standard.
    • Counties may regulate height beyond 75 feet through local ordinance.

    maximum structure height within 75 feet of ordinary high water mark: <= 35 feet (A structure taller than 35 feet is prohibited within the specified area.)

    “A structure taller than 35 feet within 75 feet of the ordinary high-water mark of any navigable waters is prohibited”
  • Well permitLimited

    Construction of private wells statewide in Wisconsin.

    • A Well Construction Notification Number must be obtained before constructing a new private well that is not a high-capacity well.
    • Exceptions to the notification requirement include high-capacity wells, reconstruction of existing wells, and wells on Native American property; high-capacity wells or other wells requiring written DNR approval follow the approval requirements.
    • Some DNR-approved county ordinances additionally require a well permit before construction.
    • A Well Construction Report must be submitted to DNR within 30 days after construction.

    well construction notification fee: 50.5 USD (Fee and notification number are not refundable or transferable.) · well construction report deadline: 30 days after construction

    “Wisconsin law requires that a property owner provide advance notice to DNR before construction of any new private well that is not a high capacity well, and advance notice of any heat exchange drillhole construction (geothermal system) that does not require a written DNR approval.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Pre-installation water and sewer systems in a manufactured/mobile home park in Wisconsin.

    • Pre-installation plumbing-system plan review is required.
    • Submitted plans must comply with the Wisconsin Plumbing Code.
    • A conditional approval letter gives permission to start construction.
    • Local permitting requirements remain pending.
    “Pre-installation plan review of the water and sewer systems in a manufactured/mobile home park is required as a plumbing system plan review via esla.wi.gov.”
  • Short-term rentalsLimited

    Lodging rented to tourists or transients for short periods in Wisconsin, including homes, condos, cabins, cottages, and similar lodging facilities.

    • A DATCP lodging permit is required for all lodging facilities in Wisconsin.
    • A tourist or transient must be away from the person's permanent address.
    • The reviewed source does not establish local zoning or municipal operating restrictions.
    “If lodging is rented to a tourist or transient, it will require a permit.”
  • Campground & park staysLimited

    Recreational trailers, pickup truck campers, and motor homes occupying campsites in Wisconsin State Park System family campgrounds.

    • Camping reservations are required before setting up on any site.
    • A campsite may contain no more than one recreation trailer, pickup truck camper, or motor home.
    • No person may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.
    • Pickup campers or motor homes pulling a trailer are treated as a single unit.

    maximum camping-unit occupancy per campsite: 1 recreation trailer, pickup truck camper, or motor home (Pickup campers or motor homes pulling a trailer are treated as a single unit.) · maximum stay: 14 days in any 21 days

    “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days.”
    3 more reviewed findings on this topic
    • Limited — Occupancy of recreational vehicles, including recreation trailers, pickup truck campers, motor homes, camper vans, and truck campers, at Wisconsin State Park System campsites.
      “A campsite may be occupied by no more than one recreation trailer, pickup truck camper or motor home. Pickup campers or motor homes pulling a trailer are treated as a single unit.”
    • Limited — Temporary camping at Wisconsin State Park System properties.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site.”
    • Limited — Temporary camping in Wisconsin State Park System family campgrounds.
      “Camping reservations are required and can be made up to 11 months in advance of your planned date of occupancy. Campers must make a reservation before setting up on any site. [...] No one may camp or leave a camping unit in a family campground for more than 14 days in any 21 days. [...] Not all properties offer camping during non-summer months. Camping seasons vary by property.”
  • county zoning authorityGeneral

    Wisconsin counties may enact and amend county zoning ordinances under Wis. Stat. § 59.69 for participating towns, which are generally unincorporated areas.

    • County zoning applies only in towns that have adopted county zoning.
    • After a comprehensive revision of the county zoning ordinance, the town has authority to decide whether county zoning applies in the town.
    • Towns have authority to approve or disapprove amendments to a county zoning ordinance.
    • A town that does not fall under county zoning may be unzoned or may have its own town zoning ordinance.
    “Counties exercise zoning ordinances under s. 59.69, Wis. Stats. County zoning only applies in towns that have adopted county zoning.”
  • county building authorityGeneral

    Wisconsin county authority to administer construction and inspection of new one- and two-family dwellings, including in unincorporated areas, through the UDC delegation and inspection framework.

    • Counties must have delegated authority to exercise UDC jurisdiction.
    • A county with delegated authority has jurisdiction over new one- and two-family dwellings in cities, villages, and towns that do not have their own delegated authority.
    • The DSPS page directs applicants to the municipality when it has delegated authority and otherwise to DSPS or the appointed county inspector.
    • The authority described is for construction and inspection under the statewide UDC; local zoning, land-use, sanitary, floodplain, and other requirements may still apply.

    covered construction: new one- and two-family dwellings (Jurisdiction depends on DSPS delegation and whether the municipality has its own delegated authority.)

    “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”
    2 more reviewed findings on this topic
    • General — County authority to enforce the statewide Uniform Dwelling Code and administer building inspection and permitting for new one- and two-family dwellings in Wisconsin, including unincorporated areas where the county is the responsible inspection authority.
      “The UDC is primarily enforced by municipal or county building inspectors who must be state-certified. In lieu of local enforcement, municipalities have the option to have the state provide enforcement for just new homes.”
    • Limited — County enforcement of Wisconsin’s Uniform Dwelling Code for new one- and two-family dwellings in municipalities, including towns, that do not have their own delegated authority
      “Counties: Counties with delegated authority have been authorized jurisdiction over the construction and inspection of new one- and two-family dwellings in cities, villages, and towns which do not have their own delegated authority.”

Set by your township or city, not the county

In Wisconsin, zoning is adopted by each township or city, so Price County has no county-wide answer on these. Find your township or city in the list of places on this page, or call its clerk or zoning administrator.

  • Camping on your land
  • Tiny homes
  • Accessory dwellings

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Price County, Wisconsin

Is Price County a good place to live off-grid or homestead?

Price County scores 75/100 on the Bolthole Index, a strong county profile. Its strengths: sparse surroundings — about 7,285 people within a 30-minute drive and manageable long-term carry cost.

Do you need a building permit in Price County, Wisconsin?

Price County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Price County Zoning Department (POWTS / sanitary permits, under WI DSPS). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Price County?

Living in an RV on your own land in Price County is limited to specific cases: Recreational-vehicle or qualifying mobile-home occupancy on a parcel in Price County. A mobile home less than 32 feet long is treated as a recreational vehicle. RV occupancy without a permit is limited to four months in a calendar year. Confirm with the county before relying on it.

How much does land cost in Price County, Wisconsin?

Land in Price County runs about $3,063 per acre, based on the latest county data.

What is the water situation in Price County?

Price County gets about 33.1" of rain a year, with severe drought in roughly 5% of years.

How remote is Price County?

A representative private-land location has about 7,285 people within a 30-minute drive and 315,340 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Price compares in Wisconsin

Compare side-by-side →See all 72 Wisconsin counties ranked →