Unincorporated Price County, Wisconsin requires two separate approvals for a new home: a county land-use permit from the Price County Zoning Department and a Wisconsin Uniform Dwelling Code building permit1. A sanitary (septic) permit must be issued first, and every sanitary permit in the county goes through the Zoning Department23. County zoning covers most unincorporated land, but five towns zone their own non-shoreland land4.
At a glance
- Building permit
- County land-use permit plus a separate UDC building permit for a new one- or two-family dwelling15
- Zoning
- County zoning applies broadly; five towns zone their own non-shoreland land4
- Septic
- Sanitary permit through the county Zoning Department, required before the new-dwelling land-use permit231
- RV living
- Limited on parcels subject to county zoning6
- Floodplain
- Floodplain development permit required in mapped flood-hazard areas7
- Tiny home
- No express tiny-home occupancy rule confirmed; ask the Zoning Department8
- Owner-builder
- An owner who occupies or will occupy the home may take out the UDC permit9
- Private well
- Advance state notification is generally required before construction10
Who to call
Zoning
Price County Zoning & Land Conservation
County zoning, land-use questions, sanitary permits and local permit coordination
Price County Normal / Annex Building 104 S Eyder Ave Room 205 Phillips, WI 54555
Roads & driveways
Price County Highway Department
Driveway access to county highways
Price County Highway Building 704 N Lake Ave Phillips, WI 54555
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Price County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit or land-use permit in Price County, Wisconsin?
Yes, and for a new house it is two permits. Unincorporated Price County requires a land-use permit application and plot plan for a new dwelling, submitted with the property's 911 uniform number, a driveway access permit and the sanitary permit11; the sanitary permit must be obtained before the land-use permit can be released1. A separate Wisconsin Uniform Dwelling Code building permit is also required for new one- and two-family dwellings, including stick-built, modular and manufactured homes112. Construction starts only after the plans are approved and the permit is issued and posted13.
The county land-use permit fee for a new dwelling is $0.22 per square foot with a $100 minimum, and the county publishes separate lower fees for additions and accessory buildings14. A permit applied for after the work is done costs double the fee15. The county's building guide notes that township, state and federal permits may also be required16. Agricultural buildings have a county land-use-permit exemption only in the circumstances described by the county, and exempt structures still must meet dimensional and setback requirements17. That exemption does not cover every state, town, sanitary or access approval.
Who issues building permits and land-use permits in Price County, and how do you reach them?
Land-use permits and sanitary permits come from Price County Zoning & Land Conservation at the Normal / Annex Building in Phillips; the office also tells applicants which other approvals a project needs8. The county verifies setback distances when it reviews the plot plan18. Building permits are a different track: Wisconsin Uniform Dwelling Code applications go to the responsible municipality or its authorized inspection agency, and a certified UDC inspector reviews the submission19. Ask the Zoning Office to identify the UDC inspector for the parcel8.
In the five towns that zone their own non-shoreland land, the town sets zoning, but sanitary permits still go through the county Zoning Department34. Permit fees for the UDC building permit vary by enforcing municipality or inspection contract, while the statewide rules include a permit-seal charge for each new dwelling20. Inspections are required before covered phases are concealed, following the local inspector's instructions21. The required inspections on a new one- or two-family dwelling are footings, foundation and reinforcement, rough work, insulation and final, and the applicant notifies the inspector named on the UDC permit when each is ready22.
Does Price County have zoning?
Yes, but the parcel location matters. County zoning governs unincorporated Price County except non-shoreland land in the Towns of Kennan, Catawba, Georgetown, Ogema and Hill; buyers in those exceptions should contact the town chairman about local zoning423. Shoreland zoning separately reaches land within 1,000 feet of a lake or flowage and within 300 feet of a river, creek or stream4.
Price County publishes zoning districts (RR-1, RF-1, A-1, CI-1 and C-1) with district-specific setbacks24. The county's principal-building setback is 10 feet in RR-1, RF-1 and C-1, 20 feet in A-1 and 15 feet in CI-1, and accessory buildings need 5 feet in most of those districts and 10 feet in A-125. Lots subject to county rules need 20,000 square feet and 100 feet of frontage when they abut water, 10,000 square feet in a sanitary district and 1 acre otherwise26. Newly created lots also need 40 feet of public-road frontage or a recorded 66-foot-wide easement26. We could not confirm a countywide minimum dwelling size; the one size rule we found is in RR-1, where a HUD-code mobile home over 320 square feet counts as the equivalent of a one-family dwelling27. Ask the Zoning Department about the specific district and design8.
How do septic permits work in Price County?
Septic permits are a county function everywhere in Price County, including the five towns that zone themselves: apply for the sanitary permit through the Price County Zoning Department3. A sanitary permit is required before issuance of any new dwelling permit2. The county describes a state sanitary permit or a qualifying privy permit as the available paths for meeting a new dwelling's sanitary requirement2. For a dwelling without pressurized water, Price County allows a privy under conditions: an open-pit privy requires a soil boring and agreement, while a vaulted privy still requires the agreement and is the only privy type identified for shoreland areas28.
Site conditions deserve early attention because the soil dataset rates 0% of county soils as free of severe limits for a conventional drain field29. That screening statistic does not decide an individual site, but it makes a soil evaluation especially important before purchase. Wisconsin also requires private wastewater systems to receive a visual inspection at least once every 3 years30.
Can you live in an RV or tiny home in Price County?
On parcels subject to Price County zoning, an RV may stay on a parcel for up to 4 months in a calendar year without a permit only when the site has a 911 number and sanitary system; a longer stay requires a land-use permit for a new dwelling.6 The county treats a mobile home under 32 feet as an RV for this rule.6
A mobile home longer than 32 feet needs land-use and sanitary permits to qualify as habitable, and older mobile homes face an additional restriction in Recreational-Residential districts.31 We could not confirm an express tiny-home occupancy rule or a general minimum home size. Ask Price County Zoning & Land Conservation how the proposed structure, foundation, utilities and parcel district affect its classification before buying or placing it.8 In one of the five non-shoreland town exceptions, also ask the town chairman about local zoning.4
Building a home in Price County: what are the steps?
- Confirm the parcel's zoning district, shoreland status, floodplain status and required setbacks with Price County Zoning & Land Conservation, and find out whether the parcel sits in one of the five towns that zone their own non-shoreland land84.
- Confirm legal access. A town-road driveway goes through the town, a county-highway driveway goes through the Price County Highway Department, and a state-highway connection needs WisDOT approval.3233
- Complete the soil work and obtain the sanitary permit from the Price County Zoning Department; it must come before the county land-use permit and the new-dwelling permit321.
- Obtain advance Wisconsin DNR notification before constructing a typical new private well.10
- Submit the county land-use permit application and plot plan to the Zoning Department, then the UDC building permit application, plans and fees to the responsible inspection authority119.
- Begin only after approval and permit posting, then call for inspections before covering each construction phase.1321
What should you check before buying land in Price County?
Start with the zoning map, parcel district and water proximity because shoreland coverage and the five town exceptions can change who answers the land-use question.4 Verify the lot meets the applicable area, frontage and access rules before treating it as buildable.26 If you plan to divide the land, a county land division carries its own fees and review, and a new lot cannot be longer than four times its width unless the Land Use and UW Extension Committee waives the ratio3435. For county-highway frontage, contact the Highway Department about driveway placement; state-highway access instead requires a WisDOT connection permit.3633
Order septic feasibility work early: the countywide soil screening shows severe conventional-drain-field limitations across the mapped soils, while the permit decision remains site-specific.29 Check mapped floodplain conditions: Price County's floodplain ordinance requires a floodplain development permit in mapped flood-hazard areas, and failing to obtain one is a violation7. Wisconsin also limits development in floodways and imposes elevation and access conditions in floodfringe areas37. Budget property carrying costs using the county's 1.4% effective property-tax rate and $2,110 median annual tax bill as broad benchmarks, not a parcel quote.3839
Watch-outs
- A new house needs a county land-use permit and a separate Uniform Dwelling Code building permit, and the sanitary permit must be issued before the land-use permit1.
- County zoning does not govern non-shoreland areas in five named towns, so contact the town chairman there; sanitary permits still go through the county Zoning Department43.
- RV occupancy without a land-use permit is time-limited and still requires a 911 number and sanitary system on parcels subject to county zoning6.
Sources
- Price County Building Requirements, quoted and re-checked
- Septic Systems, quoted and re-checked
- Zoning & Land Conservation, quoted and re-checked
- Zoning & Land Conservation, quoted and re-checked
- Price County Building Requirements (2026 county census)
- Price County Building Requirements, quoted and re-checked
- Price County Floodplain Zoning Ordinance, quoted and re-checked
- Price County Zoning & Land Conservation (co.price.wi.us)
- Wisconsin DSPS - Building a Home in Wisconsin (UDC Guide) (2026 county census)
- Well and heat exchange notification (Wisconsin statewide rule), quoted and re-checked
- Price County Building Requirements, quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
- Price County Building Requirements, quoted and re-checked
- Price County Zoning Administration 2025 Fee Schedule, quoted and re-checked
- Price County Building Requirements, quoted and re-checked
- Price County Building Requirements, quoted and re-checked
- Price County Zoning Administration 2025 Fee Schedule, quoted and re-checked
- Wisconsin Administrative Code SPS 320.09 (Wisconsin statewide rule), quoted and re-checked
- Wisconsin Administrative Code SPS 302.34 (Wisconsin statewide rule), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
- UDC Inspection Requirements, quoted and re-checked
- Zoning & Land Conservation, quoted and re-checked
- Price County Building Requirements, quoted and re-checked
- Price County Building Requirements, quoted and re-checked
- Price County Building Requirements, quoted and re-checked
- Article VI: Zoning Districts - Price County, WI, quoted and re-checked
- co.price.wi.us, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Wisconsin Maintenance Program (Wisconsin statewide rule), quoted and re-checked
- Price County Building Requirements, quoted and re-checked
- Price County Building Requirements, quoted and re-checked
- State highway connection permits (driveways & more) (Wisconsin statewide rule), quoted and re-checked
- Price County Board Packet, August 19, 2025, quoted and re-checked
- Price County Zoning Administration 2025 Fee Schedule, quoted and re-checked
- Price County Highway Department (co.price.wi.us)
- Floodplain Development Basics (Wisconsin statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.